Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance | ₹2.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.8 LRejected-Finance | ₹2.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.8 LRejected-Finance | ₹2.8 L | L3 | Rejected-Finance L3 |
Tender Value
₹2.8 L
EMD Value
₹5,668
Closing Date
18 Mar 2026, 4:00 pmClosed
SDO/AISD
SDO/AISD, Arambagh, Hooghly
Flood Protective Measures of Shaikpur Circuit Schedule embankment of river Darakeswar and Sankari from Ch. 4.3 km to Ch. 8.00 km for a length of 3.70 Km in Blocks -Arambagh, Khanakul- l and Ghatal, District -Hoohgly and West Medinipur , Under Arambag
2026_IWD_1020689_2
WBIW/SDO/AISD/e-NIT-04/25-26
Open Tender
CIVIL WORKS
150 days
Arambagh
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,668
14 May 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete . (capacity 50 kg).
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a\ lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).\ NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. (b) 15 mm thick plaster
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, Note : Add extra rate towards compensation for earth for land owned /arranged by the contractor over rate of earthwork for land owned /arranged by the Department and for royalty charges on earth as per latest rate as mentioned in PWD Schedule. The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. During initial payment of bill a deduction as per considered rate may be made. As per PwD schedule compensation charge Rs.25.00 per cum and Royalty charge Rs.18.00 per cum. Final rate = Rs.(227.00+25.00+29.00+5.30) = Rs.286.30 per cum A) Beyond 1.00 km and upto 2.00 km
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 1.87 MB
BOQ_2508834.xls
BOQ • 0.32 MB
Additional.rar
Additional Documents • 1.83 MB
Download all tender documents and submit your bid