| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.4 LAccepted-AOC | ₹77.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹78.1 L+₹77,294.70 (1.00%)Rejected-Finance | ₹78.1 L+₹77,294.70 (1.00%) | L2 | Rejected-Finance L2 |
Tender Value
₹78.1 L
EMD Value
₹1.6 L
Closing Date
30 May 2025, 3:00 pmClosed
Additional Collector(Dev)
DRDA, 4th floor,Collectorate, Erode.
Erode District Periodic Renewal the road in Package No. TN 12-02 (R) of ChennimalaiBlock under PMGSY Incentive Grant 2024-25
2025_RDTN_141313_1
DIPR/2253/Tender/2025 Dt.15.05.2025
Open Tender
Civil Works - Roads
Item Rate
120 days
Chennimalai Block
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.6 L
DRDA, 4th floor,Collectorate, Erode.
10 Jul 2025
16 May 2025
30 May 2025
16 May 2025
30 May 2025
19 May 2025
19 May 2025
Amount
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. In Area of Thorny Jungle Km 0/0-3/330
Earthwork excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shorting, strutting, providing coffer dams, bailing out of water as per 20A Km 0/0-3/330
Providing and laying including cost and conveyance of gravel from aproved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum, moisture content and hire fuel charges for poer roller, water sprinkler and all otehr incidental charges such as traffic barricading and providing danger lights etc., comp. for base course and side berms
Advance patchwork for making up the undulation in the existing B.T. Surface to an average thickness of 25mm using 13.20mm IRC size HBG metal
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2 36 and b with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate required temperature and mixing them in required temperature in central h plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site. spreading the mix to uniform thickness of 40mm with mechanical paver the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver etc., including hire charges and fuel charges for 20-30 t CMP with bitumen bo tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant req including fuel and all other incidental charges etc., complete as per specifica using CMP as per clause 507 of MORTH Rev-5
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
KM Stone
HM Stone
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of Rumble strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint
Provision for Citizen Information Board painting
Provision for Maintenance Information Board painting
Provision for Logo Board painting
Provision for 60cm Equilateral Triangle Cautionary Signboard with definition board
Provision for 60cm Circle (Mandatory Sign)
Provision for Chevron signs 90cm Octogen (Curves)
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SOLAIAPPANCONSTRUCTIONS (BID ID -618735)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .