Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC 8B GOALA PARA LANE SERAMPORE HOOGHLY | HOOGHLY | WEST BENGAL | 712101 | ₹13.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.1 LRejected-Finance | ₹14.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹14.4 LRejected-Finance | ₹14.4 L | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹26,800
Closing Date
16 Jan 2026, 1:00 pmClosed
Executive Engineer, GAP-I, EM, KMDA
Office of the Executive Engineer, GAP-I, EM, KMDA, 83 1A Vivekananda Road, 3rd floor, Kolkata-700006
Round the clock operation and minor maintenance of sewage pumping station at Serampore LS-2 under GAP-I, EM, KMDA.
2025_KMDA_975805_1
12/EE(E/M)/GAP-I/EM/ KMDA/T-12(E)/2025-26 Dt. 15/12/2025
Open Tender
ELECTRICAL WORKS M/R
322 days
Serampore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹26,800
Office of the Executive Engineer, GAP-I, EM, KMDA
30 Jan 2026
31 Dec 2025
19 Jan 2026
31 Dec 2025
16 Jan 2026
31 Dec 2025
5 Jan 2026
Round the clock operation & minor maintenance of the pumping station with sufficient staff strength at sewage pumping station (Serampore LS-2),Serampore under GAP-I, as per direction of EIC a) Total 4 nos semi skilled labour for 1 month i.e,4x1=4 man for 10 months.
For the period of Ten(10) Months.
For the period of Nineteen (19) working Days
Round the clock operation & minor maintenance for the additional 4 holidays of the sewage pumping station (Serampore LS-2),Serampore under GAP,PH-I, with this existing as per direction of EIC a) Total 4 nos semi skilled labour for 1 month i.e,4x1=4 man for 10 months.
For the period of Ten(10) Months.
For the period of 03(Three) holidays
Weekly checking of all the mechanical parts and preventive maintenance of all pump machinery as per technical specification and scope of work and direction of EIC. (Twice a week)
For the period of Ten(10) Months.
For the period of 22(Twenty two) Days
Weekly checking of all the electriical parts and preventive maintenance of all pump machinery as per technical specification and scope of work and direction of EIC.(Twice a week)
For the period of Ten(10) Months.
For the period of 22(Twenty two) Days
Supervision of all the staffs & look after the entire pump house to ascertain the overall condition of all the electro-mechanical equipments and conveying the same to the EIC or his authorized representative and to carry out the instructions given by them within the stipulated time frame.(Once a week)
For the period of Ten(10) Months.
For the period of 22(Twenty two) Days
Cleaning of the Pump house & the equipment including Supply of cosumables like soap, phenyl, duster, mop etc. (Once in a weeks)
For the period of Ten(10) Months.
For the period of 22(Twenty two) Days
Supply and delivery of Cotton Waste (White Fine Quality)
Supply and delivery of Cotton Impregnated with lubricant-Hydraulic Gland Packing (Style-376), Thickness- 13 to 25mm,Make- Champion
Supply & fixing of 230/240V, LED indicating lamp (make :AE/KAPPA/IMP) Blue/ white color
Supply & fixing of control switch of 25A, D.P., 415 V of ON/OFF of type (Make :Siemens/ABB/L&T/Schneider).
Supply of Grease
Supply of Gear Oil as per direction of Engineer in charge
Supply of Mobil Oil
Supply fitting Fixing of ss ( ISI 304) bolts, nut & washer
i) dia 10 mm to 20 mm a) Length upto 75 mm
Supply & fixing 415V, HRC fuse (L&T make)- For 2-16 A
Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_2376483.xls
BOQ • 0.34 MB
Docs12_GAP1.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid