| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC 78 2 23 B ROY RD WES T CAL 61 700061 | KOLKATA | KOLKATA | WEST BENGAL | 700061 | ₹4.8 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹4.9 LRejected-Finance 12 KEDAR CHATTERJEE LANE KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹4.9 L | L2 | Rejected-Finance FINANCIAL BID IS OPENED |
| 3 | L3₹5.0 LRejected-Finance 164 BENI MASTER LANE KOLKATA KOLKATA 700061 | KOLKATA | WEST BENGAL | 700061 | ₹5.0 L | L3 | Rejected-Finance FINANCIAL BID IS OPENED |
Tender Value
₹4.8 L
EMD Value
₹10,000
Closing Date
19 Jan 2026, 12:00 pmClosed
EXE.ENG-IX
THE KOLKATA MUNICIPAL CORPORATION 11,BELVEDERE ROAD KOLKATA-700027
LOWERING OF BITUMINOUS ROAD SURFACE, RELAYING OF KERB CHANNEL AND RAISING OR LOWERING OF PIT COVER, GULLY PIT COVER ALONG M B G LANE FROM JN. OF B K RD TO JN. OF D H RD.IN WARD 78
2026_KMC_983022_2
KMC/IX/078/2025-2026
Open Tender
CIVIL WORKS
21 days
BR-IX
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
4 Jun 2026
6 Jan 2026
21 Jan 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone.
Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone.
(23)Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.)xii) 15 mT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 565 mm. X 410 mm. X 90 mm. Frame : 715 mm. X 565 mm. X 185 mm. Weight : 140 Kg. (approx.)
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.)
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 )
HOTMIX COSTING
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(a) One Coat [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.45 MB
TF_78_99.pdf
Tender Documents • 0.56 MB
BOQ_2398432.xls
BOQ • 0.27 MB
ROAD.pdf
Additional Documents • 2.42 MB
Download all tender documents and submit your bid