Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹30.0 L+₹31,511.62 (1.06%)Accepted-Finance | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Sri Gowri Association L2 | Alagesan Contractor L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Minor Bridge at Mettuthangal Odai H/o Mettuthangal Estimate Amount : Rs.30.000 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 255.43 | Cum | 266.5 ₹68,072.1 | 263.7 ₹67,356.89 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 26.21 | Cum | 5,601.95 ₹1,46,827.11 | 5,543.18 ₹1,45,286.75 Lowest |
| 4.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Below GL ) | 125.46 | Sqm | 553.14 ₹69,396.94 | 547.34 ₹68,669.28 Lowest |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Above GL ) | 340.15 | Sqm | 1,106.28 ₹3,76,301.14 | 1,094.67 ₹3,72,352 Lowest |
| 6.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 210.75 | Cum | 5,907.61 ₹12,45,028.81 | 5,845.63 ₹12,31,966.52 Lowest |
| 7.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 10.56 | Cum | 7,004.92 ₹73,971.96 | 6,931.42 ₹73,195.8 Lowest |
| 8.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 24.48 | Cum | 9,525.61 ₹2,33,186.93 | 9,425.67 ₹2,30,740.4 Lowest |
| 9.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 3.52 | Mt | 92,804.64 ₹3,26,486.72 | 91,830.94 ₹3,23,061.25 Lowest |
| 10.00 | Provision for Bitumen Pad | 1 | No | 3,030.9 ₹3,030.9 | 3,000 ₹3,000 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
16 Sept 2025, 3:00 pmClosed
Block Development officer
BDO Office Uthangarai
Krishnagiri District Uthangarai Block Under SFC ( DP ) 2025 - 2026 Construction of Minor Bridge at Mettuthangal Odai at Mettuthangal Panchayat at Package NO 36
2025_RDTN_602438_1
Roc_No_97_2025_1(1)_12_08_2025
Open Tender
Civil Works
Item Rate
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹30,000
BDO Office Uthangarai
23 Sept 2025
10 Sept 2025
16 Sept 2025
10 Sept 2025
16 Sept 2025
10 Sept 2025
12 Sept 2025
Amount
1.Construction of Minor Bridge at Mettuthangal Odai H/o Mettuthangal Estimate Amount : Rs.30.000 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Below GL )
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Above GL )
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Provision for Bitumen Pad
Provision for Name Board charges
Provision for Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Gowri Association (BID ID -1459597)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .