| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-Finance | ₹2.8 L | 1 | Accepted-Finance Amount Bidder Quoted Value is Less than the Estimate |
| 2 | 2₹2.8 LRejected-Finance | ₹2.8 L | 2 | Rejected-Finance Bidder Quoted Value is Greater than the Estimate Amount reject |
| Sl No | Description | Qty | Unit | K.LOGANATHAN L2 | KK CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 5 | 1M3 | 165 ₹825 | 161 ₹805 |
| 2.00 | Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 0.6 | 1M3 | 5,350 ₹3,210 | 5,315 ₹3,189 |
| 3.00 | Random rubble masonry in CM 1:5 [one cement and five M-sand] for foundation and basement using best new rough and bond stones including simultaneous pointing above ground level with the same mortar etc., complete complying with standard specification. | 8 | 1M3 | 5,800 ₹46,400 | 5,758 ₹46,064 |
| 4.00 | Plastering with cement mortar 1:4 mix (one cement four P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification. | 27 | 1M3 | 290 ₹7,830 | 285 ₹7,695 |
| 5.00 | Supplying and filling Well gravel in layers of not more than 15cm thick well rammed, watered and compacted etc., complete complying with standard specification. | 4 | 1M3 | 410 ₹1,640 | 399 ₹1,596 |
| 6.00 | Plain Cement concrete 1:2:4 [one cement, two M-sand and four course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 1 | 1M3 | 6,700 ₹6,700 | 6,688 ₹6,688 |
| 7.00 | Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., | 1 | 1M3 | 27,500 ₹27,500 | 27,250 ₹27,250 |
| 8.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 276 | 1No | 376 ₹1.0 L | 375 ₹1.0 L |
| 9.00Supply and delivery of the following size of PVC Pipes with IS specification etc., complete. | |||||
| 9.10 | 50mm (1 1/2") PVC Pipe 6KSC | 510 | 1M | 48 ₹24,480 | 47.5 ₹24,225 |
Tender Value
₹2.8 L
EMD Value
₹5,600
Closing Date
20 Jan 2026, 3:00 pmClosed
Assisstant Commissioner
Tiruppur City Municipal Corporation Zone II
Construction of HDPE Tank Bed and Supply and Laying of PVC Pipe Line at Mumoorthi Nagar Ganga Nagar and Nehru Nagar in ward No 08
2025_MAWS_637415_15
E1/5252/2025/Z2
Open Tender
Civil Works
90 days
TCMC Zone II
Please Refer Tender Document
3 documents required · 3 mandatory
₹0
₹5,600
12 Mar 2026
2 Jan 2026
20 Jan 2026
2 Jan 2026
20 Jan 2026
2 Jan 2026
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Random rubble masonry in CM 1:5 [one cement and five M-sand] for foundation and basement using best new rough and bond stones including simultaneous pointing above ground level with the same mortar etc., complete complying with standard specification.
Plastering with cement mortar 1:4 mix (one cement four P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification.
Supplying and filling Well gravel in layers of not more than 15cm thick well rammed, watered and compacted etc., complete complying with standard specification.
Plain Cement concrete 1:2:4 [one cement, two M-sand and four course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc.,
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Supply and delivery of the following size of PVC Pipes with IS specification etc., complete.
50mm (1 1/2") PVC Pipe 6KSC
50mm (1 1/2")PVC Coupling
50mm (1 1/2") PVC Elbow
50mm (1 1/2")PVC Tee
50mm (1 1/2")PVC End Cap
Solvent Cement
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_763426.xls
BOQ • 0.28 MB
112.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid