| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L Quoted ₹9.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.3 LRejected-AOC | ₹11.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DIVYA ENGINEERING | M K ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc. complete. | 61.5 | Rm | 1,21,825.35 ₹1.4 L | 1,19,968.05 ₹1.4 L |
| 2.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete. | 1 | M3 | 4,850.2 ₹5,723.24 | 4,790.4 ₹5,652.67 |
| 3.00 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 214.1 | M2 | 10,983.33 ₹12,960.33 | 9,698.73 ₹11,444.50 |
| 4.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 196.1 | M2 | 2,588.52 ₹3,054.45 | 2,000.22 ₹2,360.26 |
| 5.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete | 11.4 | M2 | 12,037.26 ₹14,203.97 | 11,944.92 ₹14,095.01 |
| 6.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 1 | M3 | 9,750.4 ₹11,505.47 | 9,680.6 ₹11,423.11 |
| 7.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 50 | Kg | 5,055 ₹5,964.90 | 4,760 ₹5,616.80 |
| 8.00 | Supplying and fixing of precast jolly, rate including cost of all materials, labour, lead, lift, etc, complete. | 5.1 | M2 | 6,580.53 ₹7,765.03 | 6,376.02 ₹7,523.70 |
| 9.00 | Supplying and fixing of wooden Windows shutters with country wood outer frame of size 100 x 75mm and the shutter frame 75 x 50mm with plywood shutters 12mm thick and 5mm thick glass including cost of all materials, labour lead, lift, etc., complete. | 22.7 | M2 | 1,82,971.08 ₹2.2 L | 1,13,552.21 ₹1.3 L |
| 10.00 | Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete. | 235.2 | M2 | 56,518.56 ₹66,691.90 | 49,344.96 ₹58,227.05 |
Tender Value
Refer Docs
EMD Value
₹8,400
Closing Date
15 Oct 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair and Maintenance Works to the Inner Rooms in Type 2 Quarters Block No. 8, 21 and 22 at Analmin Nagar
2025_EB_610032_1
CE SE C TTPS 261 2025 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,400
Yes
19 Jan 2026
29 Sept 2025
16 Oct 2025
29 Sept 2025
15 Oct 2025
29 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid