| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 L+₹43,111.28 (6.94%)Admitted-Finance | ₹6.6 L+₹43,111.28 (6.94%) | L2 | Admitted-Finance |
| 3 | L3₹6.7 L+₹48,520.94 (7.81%)Admitted-Finance | ₹6.7 L+₹48,520.94 (7.81%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 L+₹97,590.80 (15.7%)Admitted-Finance | ₹7.2 L+₹97,590.80 (15.7%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualified for incomplete submission of Work order |
| Sl No | Description | Qty | Unit | AMAR BORA L4 | UTPAL RAY L1 | V. K. AGARWALLA L2 | Manash Protim Sonowal L3 |
|---|---|---|---|---|---|---|---|
| 1.00Earthwork | |||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 24.77 | cum | 220 ₹5,448.96 | 150 ₹3,715.2 Lowest | 180 ₹4,458.24 | 250.99 ₹6,216.52 |
| 1.02 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -
1:1.5:3(1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.05 | cum | 6,500 ₹97,838 | 5,130 ₹77,216.76 Lowest | 7,900 ₹1,18,910.8 | 6,610.66 ₹99,503.65 |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for all heights :
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 6 | sqm | 500 ₹3,000 | 230 ₹1,380 Lowest | 400 ₹2,400 | 269.45 ₹1,616.7 |
| 1.04 | Columns, Pillars, Piers, Abutments, Posts and Struts | 13 | sqm | 350 ₹4,550 | 210 ₹2,730 Lowest | 800 ₹10,400 | 703.72 ₹9,148.36 |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 890 | kg | 95 ₹84,550 | 82 ₹72,980 | 77 ₹68,530 Lowest | 78.44 ₹69,811.6 |
| 2.00Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | |||||||
| 2.01 | 1:4 (1 cement: 4 coarse sand) | 9.14 | cum | 7,000 ₹63,980 | 5,100 ₹46,614 Lowest | 8,500 ₹77,690 | 6,021.75 ₹55,038.8 |
| 2.02 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level
Cement mortar 1:4 (1 cement :4 coarse sand) | 61.5 | sqm | 1,000 ₹61,500 | 620 ₹38,130 Lowest | 790 ₹48,585 | 890.79 ₹54,783.59 |
| 2.03 | Steel work welded in builtup sections/ framed work, including cutting,hoisting,fixing in position and applying a primer coat of approved steel primer using structural steel etc.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,115.9 | kg | 130 ₹1,45,067 | 88 ₹98,199.2 Lowest | 106 ₹1,18,285.4 | 124.28 ₹1,38,684.05 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
6 Jul 2026, 3:00 pmClosed
Dy G M CnP
APL Namrup
Construction of Permanent Shed over Boiler Pump Motors and other electrical appliances installed in 200 TPD Formalin project at Boitamari Bongaigaon
2026_ICD_52760_1
APL/CnP/F-II/Civil/2025-26/571
Open Tender
Civil Works - Others
Item Rate
365 days
APL Namrup
Please refer tender documents
3 documents required · 3 mandatory
₹150
₹15,000
Yes
20 Aug 2026
16 Jun 2026
7 Jul 2026
16 Jun 2026
6 Jul 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.02 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -
1:1.5:3(1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for all heights :
Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
| 1.04 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| 2Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | |||||
| 2.01 | 1:4 (1 cement: 4 coarse sand) | - | cum | - | - |
| 2.02 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level
Cement mortar 1:4 (1 cement :4 coarse sand) | - | sqm | - | - |
| 2.03 | Steel work welded in builtup sections/ framed work, including cutting,hoisting,fixing in position and applying a primer coat of approved steel primer using structural steel etc.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
NIT571.pdf
Tender Documents • 1.45 MB
BOQ_83273.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .