| 1 | Accepted-Technical 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | Accepted-Technical As per Tender |
| 2 | Accepted-Technical | Accepted-Technical As per Tender |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.2 L
EMD Value
₹8,361
Closing Date
19 Sept 2026, 5:00 pmClosed
EE SHD CWC Shimla
1st Floor, Block No. 29, SDA Complex, Kasumpti, Shimla (HP) - 171009
Installation of meteorological equipment and protective fencing at various SHO sites under Upper Chenab Sub-Division, CWC Kullu
2026_CWC_925504_1
SHD/CWC/340/2026-27/1
Open Tender
Civil Works
Works
25 days
As per Tender
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,361
Yes
7 Oct 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
10 Sept 2026 - 18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Installation of meteorological equipment and protective fencing at various SHO sites under Upper Chenab Sub-Division, CWC, Kullu | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 4.1 | Cum | - | - |
| 1.02 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 34.34 | sqm | - | - |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.13 | cum | - | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) | 3.03 | cum | - | - |
| 1.05 | Chain link fabric fencing mesh of size 50x50 mm made of G.I wire of dia 4 mm | 44 | sqm | - | - |
| 1.06 | Welded steel wire fabric fencing with posts of specified material and of standard design placed and embedded in cement concrete blocks 45x45x 60 cm of mix 1:5:10 (1 cement:5 fine sand : 10 graded stone aggregate 40 mm nominal size), every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in cement concrete blocks 70x45x50 cm of the same mix, provided with welded steel wire fabric fixed between the posts fitted and fixed with G.I. staples on wooden plugs or tied to 6 mm bar nibs with G.I. binding wire (cost of posts, welded steel wire fabric, painting, earth work in excavation and concrete to be paid for separately). | 44 | sqm | - | - |
| 1.07 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete | 326.88 | Kg | - | - |
| 1.08 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonalsinterwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire. | 66 | meter | - | - |
| 1.09 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 61.23 | Kg | 65 | ₹3,979.74 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.99 MB
NITUCSDKullu.pdf
Tender Documents • 3.98 MB
BOQ_972569.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .