Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance NAGAR UTARI GARHWA | -1.50% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹2.2 L (1.52%)Admitted-Finance | +0.00% | ₹1.5 Cr+₹2.2 L (1.52%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical MOHANPUR GURGAIN BURMU RANCHI | RANCHI | JHARKHAND | 829205 | - | - | - | Rejected-Technical Responsive but application submit not open by bid |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
21 Aug 2026, 5:00 pmClosed
ZILA ABHIYNTA LATEHAR
ZILA ABHIYNATA OFFICE LATEHAR
Construction of Dak Banglow at Manika District- Latehar.
2026_ZPLAT_116912_1
ZP/LATEHAR/19/2026-27/ Gr_39
Open Tender
Civil Works - Buildings
Percentage
240 days
MANIKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.9 L
16 Sept 2026
8 Aug 2026
24 Aug 2026
8 Aug 2026
21 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 207.72 | cum | 151.82 | ₹31,536.05 |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | 207.72 | cum | 15.51 | ₹3,221.74 |
| 3 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 23.89 | cum | 589.51 | ₹14,083.39 |
| 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 370.03 | sqm | 330.34 | ₹1,22,235.71 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All wrk up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 3.93 | cum | 4,598.23 | ₹18,071.04 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 24.58 | cum | 3,751.64 | ₹92,215.31 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering,; 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) finishing and reinforcement - All work up to plinth level | 55.7 | cum | 5,218 | ₹2,90,642.6 |
| 8 | Providiag designation 75B brick work in Cement Mortar (1:6) in foudation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | 42.99 | cum | 5,110.26 | ₹2,19,690.08 |
| 9 | Providiag designation 75B brick work in Cement Mortar (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | 17.38 | cum | 5,244.08 | ₹91,142.11 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 20.91 | cum | 6,082.45 | ₹1,27,184.03 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_158040.xls
BOQ • 0.35 MB
Group_39.pdf
Tender Documents • 0.30 MB
NIT19corregendam.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .