| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 CrAccepted-Finance AT BELTIKIRI SADAR DHENKANAL | ₹2.8 Cr | 1 | Accepted-Finance Winner of lottery among the 1st lowest bidders |
| 2 | 0Rejected-Finance | - | 0 | Rejected-Finance 0 |
| 3 | Rejected-Technical AT BELTIKIRI SADAR DHENKANAL | - | - | Rejected-Technical Disqualified due to inadequate similar nature of work experience as per Clause 2.2.1 of ITB of DTCN |
| 4 | 0Rejected-Finance | - | 0 | Rejected-Finance 0 |
| 5 | 0Rejected-Finance AT BELTIKIRI SADAR DHENKANAL | - | 0 | Rejected-Finance 0 |
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
17 Mar 2026, 5:00 pmClosed
Chief Construction Engineer,RWC,Angul
ANGUL
Mahulapada - Kurumtanger road
2026_CERWI_127036_1
Road Online-AGL-38/2025-26
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Dhenkanal
2 documents required · 2 mandatory
₹10,000
₹2.8 L
Yes
18 Aug 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
9 Mar 2026 - 16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness | 2,839.92 | sqm | 8.44 | ₹23,968.92 |
| 2 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 mtrs . | 4,437.38 | sqm | 6.03 | ₹26,756.07 |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 2.4 | cum | 650.1 | ₹1,560.24 |
| 4 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, inaccordance with requirements of lines, grades and cross sections, and transporting to the embankement location with a lift of up to 1.5m and lead up to 1000m as per techincal specification clause 302.3 | 851.98 | cum | 74.79 | ₹63,719.58 |
| 5 | Loosening,levelling and compacting original ground supporting embankement to faciliate placement of first layer of embankement,scarified to a depth of 150 mm,mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction & clause-305 of MoRT&H Specifications for Road & Bridge works(4th. Revision) | 425.99 | cum | 35.58 | ₹15,156.65 |
| 6 | Construction of granular Sub-base by providing Close graded Granular sub-base Grading-III /Sand material as per table 400-1 ,spreading in unifrom layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC , and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoRT&H Specifications for road & Bridge works(4th. Revision) . | 494.85 | cum | 2,051.8 | ₹10,15,339.39 |
| 7 | Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam (WMM) specification including premixing the materialnwithb water at OMC in mechanical mix plant , carriage of mix material by tipper to site,laying in uniform layers with paver in sub base or base course on well prepared surface and compacting with Vibratory roller to achive the desired density as per Clause 406 of MoRT&H specifications for Road and Bridge works. | 1,074.29 | cum | 2,666.37 | ₹28,64,449.88 |
| 8 | Providing & applying Primer Coat with Btumen Emulsion on prepared Surface of Granular Base including clearing of road surface & applying primer at the rate of 0.60 Kg/Sqm using Mechanical meansas per clause 502 of MoRT&H specification for Road & Bridge works(4th Revision) . | 6,638.31 | sqm | 39.59 | ₹2,62,810.81 |
| 9 | Providing and applying tack coat with bitumen emulsion using emulsion distributor @ 0.20kg/sqm on the prepared surface cleaned with mechanical brooms as per clause 503 of MoRT&H Specifications for Road & Bridge works (4th.Revision) [Output-3500 sqm] | 6,638.31 | sqm | 14.42 | ₹95,724.47 |
| 10 | Providing, laying, Bituminus Macadam (BM) with hot mix plant using crushed aggrgate of specified grading premixed with bituminus binder of 60/70 penetration grade of bitumen , transported to site , laid over a previousely prepared surface with Hydrostatic Paver Finisher with sensor control to the required grade , level & Alignment and rolling with smooth wheeled Vibratory & Tendum roller to achive the desired compaction as per Clause 507 of MoRT&H specifications for Road and Bridge works. | 341.68 | cum | 8,073.4 | ₹27,58,502.77 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.37 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_584435.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .