Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 CrAccepted-AOC A B ROAD MULTANPURA BIAORA M P | BIAORA | RAJGARH | MADHYA PRADESH | ₹22.9 Cr | L1 | Accepted-AOC AWARD OF CONTRACT |
| 2 | L2₹24.2 CrRejected-Finance 26 1 SUPER DELUX OLD MINAL RESIDENCY BHOPAL M P | BHOPAL | MADHYA PRADESH | 462001 | ₹24.2 Cr | L2 | Rejected-Finance HIGHER RATES THEN L1 |
| 3 | L3₹28.0 CrRejected-Finance DISTT JALORE | JALORE | ₹28.0 Cr | L3 | Rejected-Finance HIGHER RATES THEN L1 |
| 4 | L4₹28.4 CrRejected-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹28.4 Cr | L4 | Rejected-Finance HIGHER RATES THEN L1 |
Tender Value
₹29.5 Cr
EMD Value
₹29.5 L
Closing Date
17 Jun 2022, 5:30 pmClosed
Chief Engineer (Capital Zone) MPPWD Bhopal
Office of The Chief Engineer (Capital Zone) P.W.D Bhopal M.P.
Construction of Mau Jod To Gulawata To Dhamnda To Khujner Road Tehsil Sarangpur Dist Rajgarh Total Length 22.40km. On EPC Mode First Call Estimated Cost Rs. 2953.99 Lacs work period 540 days
2022_PWDRB_200599_1
06/ G. /1/Mis/C.Z./2019 (Year 2022)
Open Tender
Civil Works - Roads
540 days
Rajgarh
As per Tender Document (RFP and Agreement)
3 documents required · 3 mandatory
₹11,800
₹29.5 L
Bhopal
24 Mar 2023
2 May 2022
20 Jun 2022
2 May 2022
17 Jun 2022
2 May 2022
11 May 2022
Amount
Construction of Mau Jod To Gulawata To Dhamnda To Khujner Road Tehsil Sarangpur Dis tRajgarh Total Length = 22.40km. On EPC Mode First Call Estimated Cost Rs. 2953.99 Lacs work period 540 days
RAJLAXAMI DEVBUILD INDIA PRIVATE LIMITED
DHAYAL CONSTRUCTION COMPANY
NARAYANDAS PHOOLCHAND MISHRA INFRASTRUCTURES PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid