Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC NO 1A 19 CAUVERY NAGAR METTUR DAM 636 401 | SALEM | TAMIL NADU | 636401 | ₹19.6 L Quoted ₹17.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.3 LRejected-AOC C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹18.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹18.8 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹18.8 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | ANBU ENGINEERING INDIA PRIVATE LIMITED L2 | THIAGARAJAN ENGINEERING CONTRACTOR L3 | SAI ENGINEERING L1 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for Removal of Secondary Crusher inlet chute and removing the crusher inlet bellow including the cost of all T&P required consumables all the Safety appliances complete. | 2 | Nos | 24,100 ₹48,200 | 24,755 ₹49,510 | 23,320 ₹46,640 |
| 2.00 | Charges for Dragging out the Secondary Crusher assembly from working area to repair place to facilitate to work including the cost of all T&P required consumables all the Safety appliances complete. | 2 | Nos | 26,600 ₹53,200 | 27,250 ₹54,500 | 25,700 ₹51,400 |
| 3.00 | Charges for Removal of Top cover Inspection door and Coil spring tension assembly of the secondary crusher including the cost of all T&P required consumables all the Safety appliances complete. | 2 | Nos | 44,000 ₹88,000 | 45,000 ₹90,000 | 42,500 ₹85,000 |
| 4.00 | Charges for Removal of Bearing housing along with Rollers of secondary crusher special lifting tackles including the cost of all T&P required consumables all the Safety appliances complete. | 4 | Nos | 58,360 ₹2,33,440 | 60,000 ₹2,40,000 | 56,350 ₹2,25,400 |
| 5.00 | Charges for transporting the new rollers from central store/MTPS-II and leading, lifting and positioning to the 7.5 mtr secondary crusher floor area including the cost of all T&P required consumables all the Safety appliances complete. | 1 | Time | 38,000 ₹38,000 | 39,000 ₹39,000 | 36,750 ₹36,750 |
| 6.00 | Charges for dismantling the eroded rollers of secondary crusher with shaft assembly including the cost of all T&P required consumables all the Safety appliances complete. | 4 | Nos | 45,060 ₹1,80,240 | 46,200 ₹1,84,800 | 43,500 ₹1,74,000 |
| 7.00 | Charges for Assembling the Secondary crusher New rollers with the existing roller shaft including the cost of all T&P required consumables all the Safety appliances complete. | 4 | Nos | 39,440 ₹1,57,760 | 40,500 ₹1,62,000 | 38,100 ₹1,52,400 |
| 8.00 | Charges for Inspection and assembling of new bearings / retrieved bearings and its bearing housing with roller shaft of secondary crusher including the cost of all T&P required consumables all the Safety appliances complete. | 8 | Nos | 29,880 ₹2,39,040 | 30,615 ₹2,44,920 | 28,900 ₹2,31,200 |
| 9.00 | Charges for supply of supply of secondary crusher bearing including the cost of all T&P required consumables all the Safety appliances complete. | 4 | Nos | 1,54,700 ₹6,18,800 | 1,58,500 ₹6,34,000 | 1,49,500 ₹5,98,000 |
| 10.00 | Charges for alignment of Rollers by using jack rod and locknut including the cost of all T&P required consumables all the Safety appliances complete. | 2 | Nos | 34,530 ₹69,060 | 35,400 ₹70,800 | 33,350 ₹66,700 |
Tender Value
Refer Docs
EMD Value
₹19,700
Closing Date
25 Aug 2025, 2:00 pmClosed
CE/ MTPS2
O/o. CE/ MTPS2
Overhauling of Secondary crusher in BAHS
2025_EB_593739_1
OT 165 Overhauling of Secondary crusher in BAHS
Open Tender
Maintenance Works
30 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,700
Yes
4 Feb 2026
18 Aug 2025
26 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid