Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Annual Contract towards dismantling, fabrication and strengthening/repairing of structural platform (Size - 16Mx3M) of 17 road weighbridges for a period of one year on as and when required basis at Dipka Expansion Project.
2025_SECL_329837_1
SECL/GM/DA/SO(EnM)/ e-tender/24-25/87 dtd-21/02/25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
4 documents required · 4 mandatory
₹36,900
6 Apr 2025
24 Feb 2025
14 Mar 2025
24 Feb 2025
12 Mar 2025
25 Feb 2025
24 Feb 2025 - 3 Mar 2025
Amount
Dismantling steel works in builtup section in angles, tees, flats & channels with all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meter lead.
Replacement of damaged plates/beams/angles and structural steel work riveted, bolted or welded in builtup sections, trusses, framed work including cutting, hoisting, fixing in position and applying primer coat of approved steel primer all complete. (Iron & steel materials shall be provided by SECL)
Providing & fixing of MS Flat (25mm x 5mm) including cutting, welding etc.
Providing & fixing of MS Nut & bolts of required size.
Note: 1). The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 08 nos. 2). All tools and tackles including Gas cutting set, welding machine, MS electrodes, jack etc. shall be provided by contractor for above work. 3). Contractor has to take up the work with manpower, tools & tackles within two (02) hours after receiving the breakdown report/information. 4). Iron and steel materials shall be provided by SECL.
Total impact of GST for the purpose of CTC
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .