Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance | -6.00% | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.3 Cr+₹30.6 L (6.13%)Admitted-Finance | -4.51% | ₹5.3 Cr+₹30.6 L (6.13%) | L2 | Admitted-Finance |
| 3 | L3₹5.5 Cr+₹47.3 L (9.47%)Admitted-Finance | +5.51% | ₹5.5 Cr+₹47.3 L (9.47%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Not Fulfill Required Criteria |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
15 Jul 2021, 6:00 pmClosed
ACE, PHED, Region Bikaner
ACE, PHED, Region Bikaner
Work of CONVERSION OF PandT WATER SUPPLY SCHEME TO PIPED WATER SUPPLY SCHEME OF VILLAGE SODHWALI BINJWARWALI MOOSALKI MEHARANA JAISA SADHERA DOOIYALI under Jal Jeevan Mission
2021_PHCJA_227507_1
ACEBI/2021-22/32
Open Tender
Civil Works - Water Works
Percentage
274 days
SODHWALI
As per TD
6 documents required · 6 mandatory
₹5,000
Executive Engineer PHED, Distt Rural DivI Bikaner
₹10.6 L
Yes
ACE, PHED, Region Bikaner
17 Sept 2021
18 Jun 2021
16 Jul 2021
18 Jun 2021
15 Jul 2021
29 Jun 2021
25 Jun 2021
Amount
Design, construction, commissioning & testing of Non Mechanical Rapid Gravity Filter Plant of capacity as under (8 hrs working in a day). This work includes construction of RCC receiving chamber, baffle channel, floculator, clarifier, collecting channel, filter beds , operation gallery, clear water chamber, channel, chlorination chamber, pipe system for carrying raw water from Pump House to inlet of RGF, clear water from Plant to CWR, De-sludging system including providing pipe system from clarifier , floculator & back wash water chamber to existing storage tank, Back wash pump set with piping system, , air blower as per design, interconnection of raw water, clear water, sludge pipes etc. including allied works such for construction ,commissioning of system as specified in tender documents at various water supply schemes
50 KLH at Headworks Bamanwali
O & M of the complete schemes upto the point mentioned in each sub order (Village boundary). It includes Cost of Basic service charges, Administration and Management, Comprehensive opoeration, Maintenance and repairs including Preventive maintenance, cost of materials required for maintenance and repairs, cost of lubricants, other consumables, transportation, spare parts, Operation & maintenance of pumping mechinery including reparing of pump sets, electric panel, suction & delivery system upto pumping main, watching of raw water conveyance, pipeline leakage detection and removal, operation of filters, valves etc. complete scheme with connected village complete in all respect. No payment for O & M during 1 year defect liability period will be admissible.
O&M for Iind Year
O&M for IIIrd year
O&M for Ivth Year
O&M for Vth Year
O&M for VIth Year
prakash builders
m/s choru lal karnani thekedar
Shiv Bhandar Construction Company
prakash builders
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_405128.xls
BOQ • 0.35 MB
32eproc.pdf
Tender Documents • 20.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .