Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹3.8 L+₹1,592.79 (0.42%)Rejected-Finance | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | L3₹3.8 L+₹3,981.98 (1.05%)Rejected-Finance | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹3.8 L
EMD Value
₹7,585
Closing Date
22 Nov 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PRADHAN RELLING
RELLING GRAM PANCHYAT
FOOTHPATH AT SANSAD NO VII
2024_GTA_765554_2
NIeT/01/RGP/15FC/2024-25
Open Tender
CIVIL WORKS
Percentage
RELLING
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,585
Yes
30 Jul 2026
29 Oct 2024
25 Nov 2024
29 Oct 2024
22 Nov 2024
29 Oct 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 300 | Sq.M | 10 | ₹3,000 |
| 2 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | 300 | Sq.M | 50 | ₹15,000 |
| 3 | Cost of stone boulder 150 mm size delivered and stacked at site. | 45 | Cu.M | 1,526.4 | ₹68,688 |
| 4 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).( c ) 9 to 12 mm. thick approved quality ply board shuttering in any concrete work. | 90 | Sq.M | 448.8 | ₹40,392 |
| 5 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.(b) River bazree. | 30 | Cu.M | 6,370.8 | ₹1,91,124 |
| 6 | 18% GST | 1 | NO. | 57,276.72 | ₹57,276.72 |
| 7 | 1% CESS | 1 | NO. | 3,754.81 | ₹3,754.81 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_1.pdf
Tender Document • 0.44 MB
BOQ_1695704.xls
BOQ • 0.22 MB
BOQ_1695704.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .