| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.0 L+₹4,973.18 (1.27%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.1 L+₹14,422.22 (3.67%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹9,940
Closing Date
29 Sept 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
NIT
2026_RDPR_325451_13
e.NIT No. 188 REW UDHAMPUR of 2026.27 Dated 21-09-2026
Open Tender
Civil Works
Percentage
60 days
udhampur
BOQ
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹9,940
6 Oct 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: A.K.S | 18.11 | cum | 479.3 | ₹8,680.12 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: Hard Rock (Blasting prohibited ) | 2.66 | cum | 2,173 | ₹5,780.18 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excluding the cost of centring and shuttering all work upto plinth Level | 3.02 | cum | 4,826.5 | ₹14,576.03 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 6.8 | cum | 5,733.6 | ₹38,988.48 |
| 5 | Centering and shuttering including strutting, propping etc and removal of the formwork. Foundation | 10.8 | sqm | 286.35 | ₹3,092.58 |
| 6 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah stone | 24.36 | cum | 5,402.9 | ₹1,31,614.64 |
| 7 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah stone | 20.2 | cum | 6,857.45 | ₹1,38,520.49 |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone. Nallah | 36.8 | cum | 2,793.8 | ₹1,02,811.84 |
| 9 | Supplying and dumping stone including cost of stones in Horizontal on level | 4.58 | cum | 937.9 | ₹4,295.58 |
| 10 | Filling available earth in backfill | 4.58 | cum | 218.4 | ₹1,000.27 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1100027.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .