| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAccepted-AOC HOUSE NO 20 BAGHARBARI VIDYANAGAR 2 PANJABARI GUWAHATI ASSAM 781037 | KAMRUP METRO | ASSAM | 781037 | ₹4.8 Cr | L1 | Accepted-AOC Awarded Contract Bidder |
| 2 | L2₹4.8 Cr+₹2.8 L (0.58%)Rejected-Finance DEKARBARI CITY TOWN BARPETA P O AMGURI P S SORBHOG DISTRICT BARPETA ASSAM PIN 781317 | BARPETA | ASSAM | 781317 | ₹4.8 Cr+₹2.8 L (0.58%) | L2 | Rejected-Finance Reject |
| 3 | L3₹4.9 Cr+₹12.5 L (2.61%)Rejected-Finance | ₹4.9 Cr+₹12.5 L (2.61%) | L3 | Rejected-Finance Reject |
| 4 | L4₹5.0 Cr+₹19.5 L (4.07%)Rejected-Finance GALIAHATI DIST BARPETA 781301 | BARPETA | ASSAM | 781301 | ₹5.0 Cr+₹19.5 L (4.07%) | L4 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Sri Gunajit Nath L3 | KANAKESH DAS L4 | M/S Royal Smart Construction L2 | Dhaneswar Kalita L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. | 210 | each | 1,400 ₹2,94,000 | 900 ₹1,89,000 | 700 ₹1,47,000 Lowest | 1,509.51 ₹3,16,997.1 |
| 2.00 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) | 55 | Meter | 1,100 ₹60,500 | 900 ₹49,500 | 700 ₹38,500 Lowest | 1,209.7 ₹66,533.5 |
| 3.00 | Providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specification. | 2 | each | 1,00,000 ₹2,00,000 | 75,000 ₹1,50,000 | 80,000 ₹1,60,000 | 57,526.43 ₹1,15,052.86 Lowest |
| 4.00 | Providing and constructing one span service road to reach island location from one pier location to another pier location | 40 | Meter | 2,500 ₹1,00,000 Lowest | 8,000 ₹3,20,000 | 5,000 ₹2,00,000 | 3,449 ₹1,37,960 |
| 5.00 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 60 | Meter | 10,000 ₹6,00,000 | 5,000 ₹3,00,000 Lowest | 5,000 ₹3,00,000 Lowest | 11,500 ₹6,90,000 |
| 6.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m | 541.5 | Cum | 67 ₹36,280.5 Lowest | 150 ₹81,225 | 150 ₹81,225 | 70.34 ₹38,089.11 |
| 7.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (ii) 3 m to 6 m depth | 129.42 | Cum | 77 ₹9,965.34 Lowest | 150 ₹19,413 | 150 ₹19,413 | 80.87 ₹10,466.2 |
| 8.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) | 672 | Metre | 12,000 ₹80,64,000 | 11,000 ₹73,92,000 | 10,500 ₹70,56,000 Lowest | 14,507.31 ₹97,48,912.32 |
| 9.00 | Levelling Coarse for Pile Cap | 25.28 | Cum | 5,152 ₹1,30,242.56 Lowest | 8,000 ₹2,02,240 | 8,000 ₹2,02,240 | 5,412.3 ₹1,36,822.94 |
| 10.00 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump | 432.22 | Cum | 8,000 ₹34,57,760 | 8,200 ₹35,44,204 | 7,000 ₹30,25,540 | 6,858 ₹29,64,164.76 Lowest |
Tender Value
₹5.2 Cr
EMD Value
₹10.3 L
Closing Date
8 Dec 2025, 2:00 pmClosed
CE(EAP), PWRD, Fatasil Ambari, Ghy.
O/o the CE(EAP), PWRD, Fatasil Ambari, Ghy.
CE/EAP/ARRBP/OCB/Bridge1/Barpeta/10C Construction of Bridge in Barpeta district i) Br. No. 1/1 on Palahartal Bazar to Balartari Bazar Road
2025_PWRDW_48953_4
EAP/ARRBP/716719/07
Open Tender
Civil Works - Bridges
Item Rate
720 days
Barpeta District
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,000
₹10.3 L
Yes
O/o the CE(EAP), PWRD, Fatasil Ambari, Ghy.
5 Sept 2026
1 Dec 2025
8 Dec 2025
1 Dec 2025
8 Dec 2025
1 Dec 2025
1 Dec 2025 - 1 Dec 2025
1 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. | 210 | each | 100 | ₹21,000 |
| 2 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) | 55 | Meter | 100 | ₹5,500 |
| 3 | Providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specification. | 2 | each | 10 | ₹20 |
| 4 | Providing and constructing one span service road to reach island location from one pier location to another pier location | 40 | Meter | 10 | ₹400 |
| 5 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 60 | Meter | 10 | ₹600 |
| 6 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m | 541.5 | Cum | 10 | ₹5,415 |
| 7 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (ii) 3 m to 6 m depth | 129.42 | Cum | 10 | ₹1,294.2 |
| 8 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) | 672 | Metre | 10 | ₹6,720 |
| 9 | Levelling Coarse for Pile Cap | 25.28 | Cum | 10 | ₹252.8 |
| 10 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump | 432.22 | Cum | 10 | ₹4,322.2 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
SBD_Barpeta_10C.pdf
Tender Documents • 4.14 MB
BOQ_77697.xls
BOQ • 0.32 MB
Volume_II_Drawings_Barpeta_10C.pdf
Additional Documents • 7.15 MB
LOT.pdf
Additional Documents • 0.54 MB
Barpeta_10C_EMP.pdf
Additional Documents • 1.62 MB
AnnexureX.pdf
Additional Documents • 0.18 MB
LOF.pdf
Additional Documents • 0.67 MB
Technical_specification_Barpeta_10C.pdf
Additional Documents • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .