| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹2.8 Cr | L1 | Accepted-AOC Agmt drawn |
| 2 | L2₹3.0 Cr+₹15.2 L (5.37%)Rejected-Finance | ₹3.0 Cr+₹15.2 L (5.37%) | L2 | Rejected-Finance Unsucessful bidder |
| 3 | L2₹3.0 Cr+₹15.2 L (5.37%)Rejected-Finance | ₹3.0 Cr+₹15.2 L (5.37%) | L2 | Rejected-Finance Unsucessful bidder |
| 4 | L2₹3.0 Cr+₹15.2 L (5.37%)Rejected-Finance | ₹3.0 Cr+₹15.2 L (5.37%) | L2 | Rejected-Finance Unsucessful bidder |
| 5 | L2₹3.0 Cr+₹15.2 L (5.37%)Rejected-Finance | ₹3.0 Cr+₹15.2 L (5.37%) | L2 | Rejected-Finance Unsucessful bidder |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
11 Mar 2026, 5:00 pmClosed
C.C.E.R.W. Circle Cuttack
C.C.E.R.W. Circle Cuttack
Construction of road from Aliara Gokana Roadin the District of Cuttack for the year 2025-26
2026_CERWI_126535_42
Tender Online RWC-27-25
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Cuttack
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.0 L
Yes
18 Jul 2026
27 Feb 2026
12 Mar 2026
27 Feb 2026
11 Mar 2026
27 Feb 2026
27 Feb 2026 - 11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ROAD PROPER | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 but excluding the charges of GST etc. complete & as per direction of the Engineer-in-Charge. | 12,546 | Sqm | 8.44 | ₹1,05,888.24 |
| 5 | Dismantling of Cement Concrete Grade M-15 & M20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 39.6 | Cum | 858.58 | ₹33,999.77 |
| 7 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | - | - | - | - |
| 8 | Upto 600mm dia | 30 | Rm | 291.53 | ₹8,745.9 |
| 9 | Scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. and as per the direction of Engineer-in-charge. | 1,083.6 | Sqm | 6.03 | ₹6,534.11 |
| 10 | Reworking the scarified bituminus surface suitably after supplementing the base materials with stone screened dust compacting finished surface as per Clause No 501.8.3.2 of Mort &H specification for raod & Bridge works (4th Revision) and as per the direction of Engineer-in-charge. | 1,083.6 | Sqm | 27.12 | ₹29,387.23 |
| 11 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m complete and as per specification and as per the direction of Engineer -in –charge. | 477.18 | Cum | 74.79 | ₹35,688.29 |
| 16 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. | 14,313.57 | Cum | 201 | ₹28,77,027.57 |
| 17 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 732.88 | Cum | 50.4 | ₹36,937.15 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
Tendernotice_2.pdf
PDF • 8.35 MB
BOQ_583544.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .