Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.1 LAccepted-Finance | ₹26.1 L | 1 | Accepted-Finance FOUND IN ORDER |
Tender Value
₹36.0 L
EMD Value
₹72,028
Closing Date
29 Apr 2026, 3:00 pmClosed
EE, NACD, APWD, Mayabunder
EE, NACD, APWD, Mayabunder
Repairs and Renovation of Office of the Subsidiary Intelligence Bureau (MHA),GOI along with 01 unit of Type III and Type II qtrs. and Rain Water Harvesting arrangements system at Lucknow under North and Middle Andaman District, Mayabunder
2026_APWD_22741_1
NIT No. 02/2026-27/EE/NACD
Open Tender
Civil Works - Buildings
90 days
EE, NACD, APWD, Mayabunder
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹72,028
5 May 2026
20 Apr 2026
29 Apr 2026
20 Apr 2026
29 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 1.01 | All kinds of soil. | - | cum | 0.88 | - | 2 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||
| 2.01 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 0.2 | - | 4 |
| 2.02 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 0.04 | - | 5 |
| 3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | ||||||
| 3.01 | 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 0.2 | - | 7 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for | ||||||
| 4.01 | Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | 0.24 | - | 9 |
| 5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | ||||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
Tenderdocument.pdf
Tender Documents • 4.43 MB
BOQ_24096.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid