Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2 L
Closing Date
13 Jul 2026, 9:30 pm5d left
Public Works Department
Widening and Improvement of Gadiyara Kamba Circle as per IRC Standards in Koppal Town
PWD/2026-27/RD/WORK_INDENT36971
PWD/2026-27/RD/WORK_INDENT36971
Open
Roads
PWD Division Office Koppala
5 documents required · 5 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
As per Clause 3.2(a): To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23 2023-24, 2024-25 and 2025-26 (a) achieved in at least two financial years a minimum financial turn over (in all classes of civil engineering construction works only) of Rs. 217.00 Lakhs. (usually not less than two times the estimated annual payments under this contract)
As per Clause 3.2(b) : To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23 2023-24, 2024-25 & 2025-26 (b)satisfactorily completed (at least 90% of the contract value) as prime contractor, atleast one similar work such as BT Road Work of value not less than Rs.54.25 Lakhs. (usually not less than 50% estimated value of contract)
Executed in any one year the following minimum quantities of work (Earth work/subgrade-88.50 cum BM /BC/SDBC-273.11 cum Cement Concrete - 95.43 cum, GSB-55.44 cum Steel-2.15 Tonne)80% of peak rate of construction from 2021-22 to 2025-26
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23 2023-24, 2024-25 & 2025-26 (b)satisfactorily completed (at least 90% of the contract value) as prime contractor, atleast one similar work such as BT Road Work of value not less than Rs.54.25 Lakhs. (usually not less than 50% estimated value of contract)
Liquid assets and /or availability of credit facilities of no less than Rs. 54.25 Lakhs (estimated cash flow for 3 months of peak construction period)
List of existing commitments and ongoing works
List of works for which tenders already submitted
₹2,720
₹2 L
30 Jun 2026
30 Jun 2026
14 Jul 2026
6 Jul 2026
4 Jul 2026
Financial Year Total value of Civil Engineering works executed and payments received in the last five years (in Rs. lac)
Attach Chartered Accountant's Yearwise Statements.
Work executed as prime contractor (in the same name) on works of similar nature during the five years specified)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon Actual date of completion Remarks (appreciation letter received for early completion or reasons, if there is delay in completion)
Attach Workdone Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
FORMAT FOR WORK DONE CERTIFICATE TO BE OBTAINED FROM COMPETENT AUTHORITY
has executed/ is executing(strike off which ever is not applicable) the work of .............................................
in this Organisation. The details of the work is as under:
1 Name of the Project :
2 Name of the Work :
3 Contract Amount :
4 Date of signing the Agreement :
5 Date of handing over of the Site :
6 Progress * : 2021
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
PCC/RCC Physical in cum :
Financial in lac :
SSM/BBM Physical in cum :
Financial in lac :
Steel Physical in Tonnes :
Financial in lac :
Shuttering/Centering Physical is sqm :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Progress * : 2022
January February March April May June July August September October November December
Earthwork Physical in cum :
PCC/RCC Physical in cum :
Financial in lac :
SSM/BBM Physical in cum :
Financial in lac :
Steel Physical in Tonnes :
Financial in lac :
Shuttering/Centering Physical is sqm :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Progress * : 2023
January February March April May June July August September October November December
Earthwork Physical in cum :
Physical in cum :
Financial in lac :
SSM/BBM Physical in cum :
Financial in lac :
Steel Physical in Tonnes :
Financial in lac :
Shuttering/Centering Physical is sqm :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Progress * : 2024
January February March April May June July August September October November December
Earthwork Physical in cum :
Physical in cum :
Financial in lac :
SSM/BBM Physical in cum :
Financial in lac :
Steel Physical in Tonnes :
Financial in lac :
Shuttering/Centering Physical is sqm :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Progress * : 2025
January February March April May June July August September October November December
Earthwork Physical in cum :
Physical in cum :
Financial in lac :
SSM/BBM Physical in cum :
Financial in lac :
Steel Physical in Tonnes :
Financial in lac :
Shuttering/Centering Physical is sqm :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Progress * : 2026
January February March April May June July August September October November December
Earthwork Physical in cum :
Physical in cum :
Financial in lac :
SSM/BBM Physical in cum :
Financial in lac :
Steel Physical in Tonnes :
Financial in lac :
Shuttering/Centering Physical is sqm :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Progress * : 2027
January February March April May June July August September October November December
Earthwork Physical in cum :
Physical in cum :
Financial in lac :
SSM/BBM Physical in cum :
Financial in lac :
Steel Physical in Tonnes :
Financial in lac :
Shuttering/Centering Physical is sqm :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
7 Stipulated Period of Completion (including monsoon)
8 Prescribed Date of completion
9 Actual Date of Completion/ Probable Date of Completion
10 Cost of balance work (if work is in progress) :
11 Reasons if any for delay in completion, if work completion is delayed :
12 Penalty if any imposed :
13 Any other information :
* Monthwise progress shall be furnished seperately.
Date: (Authorised Signatory)
Address for correspondence:
Monthly Physical and Financial Progress Achieved in all Contracts which are referred to in Format 3
Names of Works Item of Work Names of Employers Remarks (Indicate contract reference)
January February march April May June July August September October November December
Earthwork Physical
PCC/RCC Physical
SSM/BBM Physical
Shuttering/Centering Physical
Others (Pl specify) Physical
Earthwork Physical
PCC/RCC Physical
SSM/BBM Physical
Shuttering/Centering Physical
Others (Pl specify) Physical
Earthwork Physical
PCC/RCC Physical
SSM/BBM Physical
Shuttering/Centering Physical
Others (Pl specify) Physical
Earthwork Physical
PCC/RCC Physical
SSM/BBM Physical
Shuttering/Centering Physical
Others (Pl specify) Physical
Earthwork Physical
PCC/RCC Physical
SSM/BBM Physical
Shuttering/Centering Physical
Others (Pl specify) Physical
Earthwork Physical
PCC/RCC Physical
SSM/BBM Physical
Shuttering/Centering Physical
Others (Pl specify) Physical
Earthwork Physical
PCC/RCC Physical
SSM/BBM Physical
Shuttering/Centering Physical
Others (Pl specify) Physical
Information on works which are yet to be completed.
(EXISTING COMMITMENTS AND ON-GOING WORKS)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon cost of balance works remaining Rs. in lac Probable date of completion
Attach Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Information of the works for which Tender acceptance letters are received.
Project Name Name & Address of the Employer Name of Work Tendered Amount in Rs lac Specified period of completion (including/excluding Monsoon Probable Date of Handing over of site
Attach letters of Acceptance received.
Information of the works for which Tenderer has submitted Tender.
Project Name Name & Address of the Employer Name of Work Amount put to Tender in Rs lac. Specified period of completion (including/excluding Monsoon Prescribed last date of submission of tender Probable date of decision on the Tender Remarks if any.
List of Machineries Required
Item of Equipment Requirement Owned/ Hired/Leased Owned/ Hired/Lease and available Remarks
No. Capacity Number/Capacity Age/ Condition
BANKER’S CERTIFICATE
This is to certify that M/s. ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely........................................................................................................................................ (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………...........................................… to meet the working capital requirements for executing the above contract
Name of the Bank, Senior Bank Manger
Address:…………………………
Information on litigation in which the Tenderer is involved:
Other Party/Parties Employer Details of Dispute Amount involved Remarks showing Present Status
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Road concrete pavement specification.doc
Instructions to Tenderers • 2.20 MB
kppp formats_kw-4- bld-1.xls
Instructions to Tenderers • 0.13 MB
kbs-section-16 electrification-external.doc
Instructions to Tenderers • 0.43 MB
kbs-section-16 electrification-internal.doc
Instructions to Tenderers • 0.27 MB
Wi 36971 KW 4.docx
Tender Document • 0.95 MB
Download all tender documents and submit your bid