| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAdmitted-Finance NEAR GURU NANAK NURSING TRAINING CENTER VARSANA ROAD POST OFFICE NAGARA JALANDHAR | JALANDHAR | JALANDHAR | PUNJAB | ₹39.9 L | L1 | Admitted-Finance |
| 2 | L2₹48.8 L+₹8.9 L (22.2%)Admitted-Finance I 83 LAJPAT NAGAR II NEW DELHI DELHI 110024 | SOUTH EAST DELHI | DELHI | 110024 | ₹48.8 L+₹8.9 L (22.2%) | L2 | Admitted-Finance |
| 3 | L3₹49.7 L+₹9.8 L (24.5%)Admitted-Finance 213 214 215 HUBTOWN SOLARIS NS PHADKE MARG ANDHERI EAST MUMBAI MUMBAI MAHARASHTRA 400069 | MUMBAI SUBURBAN | MAHARASHTRA | 400069 | ₹49.7 L+₹9.8 L (24.5%) | L3 | Admitted-Finance |
| 4 | L4₹51.4 L+₹11.4 L (28.6%)Admitted-Finance | ₹51.4 L+₹11.4 L (28.6%) | L4 | Admitted-Finance |
| 5 | L5₹51.9 L+₹12.0 L (29.9%)Admitted-Finance | ₹51.9 L+₹12.0 L (29.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NETWORK INDIA L5 | Rudra Sports Infra L4 | Syncotts International L6 | RAYZON GLOBAL LLP L3 | ITE INDIA PVT LTD L2 | ANANDCO SPORTING CORPORATION L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Box Cricket cum Futsal Court 01 Nos | |||||||||
| 1.01 | Construction of Asphalt Base Surface – having 8” inch pavement which consists of:
• Excavation to a depth between 3 inches to remove all weeds and grass from its roots, create a slope of 1” in every 10’ in the sub-base on the shorter axis. (without any grass or weeds). Extreme care would need to be taken to ensure a correct slope of 1” in every 10’.
• Carry out anti termite and weedicide on the total area by making 9” deep holes spaced 12” apart and injecting the chemicals and also spraying.
•WBM Work – Layer of Compacted 6” WBM (Subject to availability) using Stone Size 40 MM to 60 MM using good earth as binder (for WBM). Compaction of same using Road Roller of 8–10-ton capacity. [It will be done in two layers]
•BM Work – Compacted layer of up to 30 mm Thickness of Bituminous Macadam using mix of 20 mm and 12 MM Stone with 80-100/60-70 Grade Bitumen (Subject to availability). The compaction of the BM layer to be done using road roller of capacity 8-10 ton.
• BC Work – Compacted layer of up to 20 mm Thickness of Bituminous Concrete using 6mm Stone (Mixture of 0-6mm Stones) with 80-100/60-70 Grade Bitumen (Subject to availability). The compaction of the BC layer to be done using road roller of capacity 8-10 ton.
• Seal Coat – Final Layer of Seal dust using Stone Dust with Bitumen to make the surface appropriate for Turf Installation. | 5,959 | Sq.ft. | 8,04,465 ₹8,04,465 | 11,95,375.4 ₹11,95,375.4 | 8,58,096 ₹8,58,096 | 7,86,588 ₹7,86,588 | 9,59,399 ₹9,59,399 | 5,66,105 ₹5,66,105 Lowest |
| 1.02 | Construction of open saucer one side drain as per court requirement and standards. The height of drain should match the side of the court as per the standard norms. This drain will channelize water. | 101 | Sq.ft. | 26,260 ₹26,260 | 20,200 ₹20,200 Lowest | 33,532 ₹33,532 | 72,720 ₹72,720 | 26,260 ₹26,260 | 22,220 ₹22,220 |
| 1.03 | Construction of supported toe wall. 9” Width & 12” height [6” below the ground and 6” above the ground] and Toe wall would have hard cement plastered all visible side. (All four sides) | 320 | Sq.ft. | 1,12,000 ₹1,12,000 | 96,000 ₹96,000 | 1,32,160 ₹1,32,160 | 1,66,400 ₹1,66,400 | 54,400 ₹54,400 Lowest | 70,400 ₹70,400 |
| 1.04 | Artificial turf (Grass) FIFA Approved– Cricket 15 mm pile height [One roll – 25m x 4m=100 sqm]
For Box cricket, Synthetic grass with 10 mm pile height/thickness with an infill of clean graded silica sand. Synthetic grass is generally laid on Asphalt/concrete base and stays in place by sheer weight of silica sand. Synthetic grass comes in carpet form and can be shifted and reused at different site.
Make of Grass – Bellin | 1,076 | Sq.ft. | 1,72,160 ₹1,72,160 | 1,39,664.8 ₹1,39,664.8 | 2,06,592 ₹2,06,592 | 1,37,728 ₹1,37,728 | 47,344 ₹47,344 Lowest | 1,07,600 ₹1,07,600 |
| 1.05 | Supply and Installation of FIFA Approved Turf, Pile Height - 50mm, Guage 3/8, Stitches/10cm - 26 ± 10%, Dtex - PP+PE/12000, Density-22300, Backing-Double PP+Mesh+SBR, U.V. Stability- Yes, Colour - Green/Dual Tone Make- Bellin Advance Turf. | 5,959 | Sq.ft. | 10,72,620 ₹10,72,620 | 10,54,743 ₹10,54,743 | 12,27,554 ₹12,27,554 | 8,64,055 ₹8,64,055 | 8,52,137 ₹8,52,137 | 6,85,285 ₹6,85,285 Lowest |
| 1.06 | P/F of Football Goal Post Movable Size: Football Goal post movable in ground type made of 4” dia Heavy MS pipe size 24’ x 8’ with 1.5” back support and PU wheels. Special net lock made of PVC for easily hanging the net. Made according to FIFA approved design and specifications. Fully welded corner joints provide superior strength and added safety for players. Use of branded MRF Epoxy paint.This include net also. | 1 | Pair | 75,000 ₹75,000 | 53,100 ₹53,100 | 1,25,000 ₹1,25,000 | 60,000 ₹60,000 | 50,000 ₹50,000 Lowest | 75,000 ₹75,000 |
| 1.07 | Supply & Installation of MS POLE WITH FRAMING: [25 ft Height]
MS POLE with framing which is generally required for Futsal court. This will consist of 25 ft height with Pipe 3” x 3” vertical post and horizontal pipe 2” x 2” and thickness of pipe will be 2mm. Pipe will be of MS spaced 10 ft apart on all four sides of the court with one or two gates. The top, middle and bottom of the horizontal pipe will be 50mm x 50mm dia pipes. | 8,000 | Sq.ft. | 7,84,000 ₹7,84,000 | 5,66,400 ₹5,66,400 | 7,36,000 ₹7,36,000 | 9,92,000 ₹9,92,000 | 6,40,000 ₹6,40,000 | 4,40,000 ₹4,40,000 Lowest |
| 1.08 | Supply & Installation of Net on all four sides and on Roof, Quality of Net: Garware Tournament, Vertical Net thickness: 2.5mm, Top Net Thickness: 1.5mm and color: Green UV treated. | 13,959 | Sq.ft. | 2,79,180 ₹2,79,180 | 1,64,716.2 ₹1,64,716.2 Lowest | 3,48,975 ₹3,48,975 | 3,62,934 ₹3,62,934 | 6,14,196 ₹6,14,196 | 2,93,139 ₹2,93,139 |
| 1.09 | Supply & Installation Lighting System-
1. LED FIXTURES of 200 Watt each.
2. All lights will be installed on the brackets.
3. 10 Brackets will be made one side & 10 on other sides. Bracket will be made of 1.5” x 1.5” MS pipe
4. 2.5mm copper flexible wire installed on each light with conduiting/wiring on MCB box will be done as required. Six or Seven lights connection will be given on one circuit.
Bus green color will be done on the brackets with 1 coat red oxide & 2 coat Bus green enamel paint) LED Fixtures – Philips, Wiring – Phenolix/Polycap , MCB’s – L&T or Schindler | 20 | Job | 4,00,000 ₹4,00,000 | 2,36,000 ₹2,36,000 | 3,54,000 ₹3,54,000 | 2,10,000 ₹2,10,000 | 1,00,000 ₹1,00,000 Lowest | 2,40,000 ₹2,40,000 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
8 Aug 2026, 6:55 pmClosed
Chief Executive Officer, VSCL
2nd Floor Trinetra Bhawan, Sigra, Varanasi
Construction Of 01 Box Cricket Cum Futsal Court, 02 Pickel Ball Courts at Dr Sampoornanand Sports Stadium Sigra Varanasi
2026_NNVAR_1170608_1
140/T/VSCL/2026-27
Open Tender
Civil Works
Item Rate
60 days
Varanasi
AS PER RFP DOCUMENT
3 documents required · 3 mandatory
₹11,800
Chief Executive Officer, Varanasi Smart City Ltd
₹1.2 L
Office of VSCL
10 Sept 2026
18 Jul 2026
10 Aug 2026
18 Jul 2026
8 Aug 2026
25 Jul 2026
18 Jul 2026 - 25 Jul 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Box Cricket cum Futsal Court 01 Nos | |||||
| 1.01 | Construction of Asphalt Base Surface – having 8” inch pavement which consists of:
• Excavation to a depth between 3 inches to remove all weeds and grass from its roots, create a slope of 1” in every 10’ in the sub-base on the shorter axis. (without any grass or weeds). Extreme care would need to be taken to ensure a correct slope of 1” in every 10’.
• Carry out anti termite and weedicide on the total area by making 9” deep holes spaced 12” apart and injecting the chemicals and also spraying.
•WBM Work – Layer of Compacted 6” WBM (Subject to availability) using Stone Size 40 MM to 60 MM using good earth as binder (for WBM). Compaction of same using Road Roller of 8–10-ton capacity. [It will be done in two layers]
•BM Work – Compacted layer of up to 30 mm Thickness of Bituminous Macadam using mix of 20 mm and 12 MM Stone with 80-100/60-70 Grade Bitumen (Subject to availability). The compaction of the BM layer to be done using road roller of capacity 8-10 ton.
• BC Work – Compacted layer of up to 20 mm Thickness of Bituminous Concrete using 6mm Stone (Mixture of 0-6mm Stones) with 80-100/60-70 Grade Bitumen (Subject to availability). The compaction of the BC layer to be done using road roller of capacity 8-10 ton.
• Seal Coat – Final Layer of Seal dust using Stone Dust with Bitumen to make the surface appropriate for Turf Installation. | 5,959 | Sq.ft. | - | - |
| 1.02 | Construction of open saucer one side drain as per court requirement and standards. The height of drain should match the side of the court as per the standard norms. This drain will channelize water. | 101 | Sq.ft. | - | - |
| 1.03 | Construction of supported toe wall. 9” Width & 12” height [6” below the ground and 6” above the ground] and Toe wall would have hard cement plastered all visible side. (All four sides) | 320 | Sq.ft. | - | - |
| 1.04 | Artificial turf (Grass) FIFA Approved– Cricket 15 mm pile height [One roll – 25m x 4m=100 sqm]
For Box cricket, Synthetic grass with 10 mm pile height/thickness with an infill of clean graded silica sand. Synthetic grass is generally laid on Asphalt/concrete base and stays in place by sheer weight of silica sand. Synthetic grass comes in carpet form and can be shifted and reused at different site.
Make of Grass – Bellin | 1,076 | Sq.ft. | - | - |
| 1.05 | Supply and Installation of FIFA Approved Turf, Pile Height - 50mm, Guage 3/8, Stitches/10cm - 26 ± 10%, Dtex - PP+PE/12000, Density-22300, Backing-Double PP+Mesh+SBR, U.V. Stability- Yes, Colour - Green/Dual Tone Make- Bellin Advance Turf. | 5,959 | Sq.ft. | - | - |
| 1.06 | P/F of Football Goal Post Movable Size: Football Goal post movable in ground type made of 4” dia Heavy MS pipe size 24’ x 8’ with 1.5” back support and PU wheels. Special net lock made of PVC for easily hanging the net. Made according to FIFA approved design and specifications. Fully welded corner joints provide superior strength and added safety for players. Use of branded MRF Epoxy paint.This include net also. | 1 | Pair | - | - |
| 1.07 | Supply & Installation of MS POLE WITH FRAMING: [25 ft Height]
MS POLE with framing which is generally required for Futsal court. This will consist of 25 ft height with Pipe 3” x 3” vertical post and horizontal pipe 2” x 2” and thickness of pipe will be 2mm. Pipe will be of MS spaced 10 ft apart on all four sides of the court with one or two gates. The top, middle and bottom of the horizontal pipe will be 50mm x 50mm dia pipes. | 8,000 | Sq.ft. | - | - |
| 1.08 | Supply & Installation of Net on all four sides and on Roof, Quality of Net: Garware Tournament, Vertical Net thickness: 2.5mm, Top Net Thickness: 1.5mm and color: Green UV treated. | 13,959 | Sq.ft. | - | - |
| 1.09 | Supply & Installation Lighting System-
1. LED FIXTURES of 200 Watt each.
2. All lights will be installed on the brackets.
3. 10 Brackets will be made one side & 10 on other sides. Bracket will be made of 1.5” x 1.5” MS pipe
4. 2.5mm copper flexible wire installed on each light with conduiting/wiring on MCB box will be done as required. Six or Seven lights connection will be given on one circuit.
Bus green color will be done on the brackets with 1 coat red oxide & 2 coat Bus green enamel paint) LED Fixtures – Philips, Wiring – Phenolix/Polycap , MCB’s – L&T or Schindler | 20 | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
BOQ_2196618.xls
BOQ • 0.30 MB
RFP1402627.pdf
Tender Documents • 1.46 MB
Corr1.pdf
PDF • 10.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .