Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.6 LAdmitted-Finance | ₹38.6 L | L1 | Admitted-Finance |
| 2 | L2₹39.9 L+₹1.3 L (3.33%)Admitted-Finance 0 UMARCHHA KACHHAR MAHGAON CHAIL ALLAHABAD UTTAR PRADESH 212213 UDYAM UP 46 0009010 | KAUSHAMBI | UTTAR PRADESH | 212213 | ₹39.9 L+₹1.3 L (3.33%) | L2 | Admitted-Finance |
| 3 | L3₹46.8 L+₹8.2 L (21.3%)Admitted-Finance | ₹46.8 L+₹8.2 L (21.3%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualfied. |
| Sl No | Description | Qty | Unit | j k enterprises L2 | Infinite Construction L1 | Sunil sharma L3 |
|---|---|---|---|---|---|---|
| 0.00Imp. Note - a) The bidder must possess valid EPF & ESIC registration. The bidders need to deposit EPF & ESIC with appropriate authority. The reimbursement for EPF & ESIC deposit shall not be made. b) The payment of wages to labourers should be made through bank. c) The bidder must possess sufficient manpower & other resources (as detailed in SGF ) required for the timely completion of work. d) The minimum amount of bill to be paid shall be Rs. 6.75 lakhs. e) A land for the construction of contractor shade in RRCAT premises shall be provided for material storage and contractor has to make arrangement for temporary shade at the alloted space for the shade & same must be removed after the completion of the work at their own cost. If contractor is allow to use departmental constructed space, same shall be charge @ 500/- per Sqm per month and contractor has to handover the same in good condition after the storage use. | ||||||
| 1.00 | Earthwork excavation over areas in all soils except soft and hard rock by manual means and disposing off & levelling the soil within a distance of 50 metre. All complete as per drawing, specifications & as directed by the Engineer-in-charge. | 10 | Cum | 333 ₹3,330 | 200 ₹2,000 Lowest | 400 ₹4,000 |
| 2.00Earthwork excavation in foundations in all soils other than soft and hard rock by manual means upto a depth not exceeding 1.5 m. including shoring and dewatering, if necessary and refilling around foundations and in plinth with selected excavated earth, in layers not exceeding 250mm thick, consolidating etc., and disposing surplus earth within a distance of 50 metre lead. (Depth of excavation shall be measured from the existing average ground level.) All complete as per drawing, specifications & as directed by the Engineer-in-charge. | ||||||
| 2.10 | 0.00 metre to 1.50 metre below average G.L | 20 | Cum | 399 ₹7,980 | 200 ₹4,000 Lowest | 450 ₹9,000 |
| 2.20 | 1.50 metre to 3.0 metre below average G.L | 20 | Cum | 399 ₹7,980 | 250 ₹5,000 Lowest | 589 ₹11,780 |
| 3.00Earthwork excavation in foundations in soft rock by manual means upto a depth specified below including shoring and dewatering, if necessary and refilling around foundations and in plinth with selected excavated earth, in layers not exceeding 250mm thick, consolidating etc., and disposing of surplus earth within a distance of 50 metre lead as per drawings, specifications and as directed by the Engineer-in-Charge. (Depth of excavation shall be measured from the existing average ground level.) | ||||||
| 3.10 | 0.00 metre to 1.50 metre below average G.L | 10 | Cum | 459 ₹4,590 | 450 ₹4,500 Lowest | 800 ₹8,000 |
| 3.20 | 1.50 metre to 3.0 metre below average G.L | 10 | Cum | 459 ₹4,590 Lowest | 550 ₹5,500 | 889 ₹8,890 |
| 4.00 | Filling under floors, with Murrum brought from anywhere in RRCAT Campus, spreading in 200 mm thick layers, watering, consolidating each layer with 1/2 tonne roller & rolling every third & top most layer with 8 tonnes capacity roller, finished to the desired levels etc. complete. NOTE : Royalty Receipts shall have to be submitted by the contractor from concerned department. | 20 | Cum | 666 ₹13,320 | 500 ₹10,000 Lowest | 950 ₹19,000 |
| 5.00Lead charges, by mechanical transport to anywhere in RRCAT CAMPUS, including loading, unloading, stacking/levelling etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge. | ||||||
Tender Value
₹40.5 L
EMD Value
₹81,000
Closing Date
23 Jul 2026, 3:00 pmClosed
CHIEF ENGINEER, RRCAT, INDORE
CSD OFFICE RRCAT INDORE
Refurbishment of CVD hall at RandD Block-E and Miscellaneous Civil Works at RRCAT, Indore.
2026_RRCAT_913493_1
RRCAT/CSD/W-4417/2026/138
Open Tender
Civil Works
Item Rate
180 days
RRCAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹81,000
11 Sept 2026
17 Jun 2026
27 Jul 2026
19 Jun 2026
23 Jul 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Imp. Note - a) The bidder must possess valid EPF & ESIC registration. The bidders need to deposit EPF & ESIC with appropriate authority. The reimbursement for EPF & ESIC deposit shall not be made. b) The payment of wages to labourers should be made through bank. c) The bidder must possess sufficient manpower & other resources (as detailed in SGF ) required for the timely completion of work. d) The minimum amount of bill to be paid shall be Rs. 6.75 lakhs. e) A land for the construction of contractor shade in RRCAT premises shall be provided for material storage and contractor has to make arrangement for temporary shade at the alloted space for the shade & same must be removed after the completion of the work at their own cost. If contractor is allow to use departmental constructed space, same shall be charge @ 500/- per Sqm per month and contractor has to handover the same in good condition after the storage use. | |||||
| 1 | Earthwork excavation over areas in all soils except soft and hard rock by manual means and disposing off & levelling the soil within a distance of 50 metre. All complete as per drawing, specifications & as directed by the Engineer-in-charge. | 10 | Cum | - | - |
| 2Earthwork excavation in foundations in all soils other than soft and hard rock by manual means upto a depth not exceeding 1.5 m. including shoring and dewatering, if necessary and refilling around foundations and in plinth with selected excavated earth, in layers not exceeding 250mm thick, consolidating etc., and disposing surplus earth within a distance of 50 metre lead. (Depth of excavation shall be measured from the existing average ground level.) All complete as per drawing, specifications & as directed by the Engineer-in-charge. | |||||
| 2.1 | 0.00 metre to 1.50 metre below average G.L | 20 | Cum | - | - |
| 2.2 | 1.50 metre to 3.0 metre below average G.L | 20 | Cum | - | - |
| 3Earthwork excavation in foundations in soft rock by manual means upto a depth specified below including shoring and dewatering, if necessary and refilling around foundations and in plinth with selected excavated earth, in layers not exceeding 250mm thick, consolidating etc., and disposing of surplus earth within a distance of 50 metre lead as per drawings, specifications and as directed by the Engineer-in-Charge. (Depth of excavation shall be measured from the existing average ground level.) | |||||
| 3.1 | 0.00 metre to 1.50 metre below average G.L | 10 | Cum | - | - |
| 3.2 | 1.50 metre to 3.0 metre below average G.L | 10 | Cum | - | - |
| 4 | Filling under floors, with Murrum brought from anywhere in RRCAT Campus, spreading in 200 mm thick layers, watering, consolidating each layer with 1/2 tonne roller & rolling every third & top most layer with 8 tonnes capacity roller, finished to the desired levels etc. complete. NOTE : Royalty Receipts shall have to be submitted by the contractor from concerned department. | 20 | Cum | - | - |
| 5Lead charges, by mechanical transport to anywhere in RRCAT CAMPUS, including loading, unloading, stacking/levelling etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.86 MB
SPEC.pdf
Tender Documents • 1.90 MB
NIT.pdf
Tender Documents • 0.85 MB
BOQ_960000.xls
BOQ • 0.33 MB
SPNPH.pdf
Tender Documents • 3.53 MB
SGF.pdf
Tender Documents • 1.94 MB
SchdeuleB.pdf
Tender Documents • 0.26 MB
listofmakes.pdf
Tender Documents • 0.11 MB
CCC.pdf
Tender Documents • 2.45 MB
ScheduleA.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .