Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹35.2 L+₹7.0 L (24.9%)Rejected-AOC NO 1 3RD FLOOR HAMEEDIA COMPLEX 108 TRIPLICANE HIGH ROAD TRIPLICANE CHENNAI 600 005 | CHENNAI | CHENNAI | TAMIL NADU | 600005 | 2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical BQR condition 1 and 2 is Not Satisfied |
| Sl No | Description | Qty | Unit | CHANDY INSULATIONS PVT LTD L2 | SMU ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of existing ceramic blanket insulation and re-insulation with 225mm thickness ceramic blanket over the HP and IP casing, Control Valves including supply of insulating material. | 77 | M2 | 5,39,000 ₹6,36,020 | 4,39,901 ₹5,19,083.18 Lowest |
| 2.00 | Removal of existing ceramic blanket insulation and re-insulation with 250mm thickness ceramic blanket over the HP & IP casing and Control Valves including supply of insulating material. | 108 | M2 | 7,56,000 ₹8,92,080 | 6,17,004 ₹7,28,064.72 Lowest |
| 3.00 | Removal of Double layer lagging and cladding in LP turbine middle part | 24.38 | M2 | 9,752 ₹11,507.36 | 7,850.36 ₹9,263.42 Lowest |
| 4.00 | Re-insulation of Double layer lagging and cladding in LP turbine middle part | 24.38 | M2 | 29,256 ₹34,522.08 | 23,258.52 ₹27,445.05 Lowest |
| 5.00 | Charges for disposal, cleaning and transportation of waste insulation material from work spot to ear marked area to dump. | 2 | Nos | 9,300 ₹10,974 | 7,330 ₹8,649.4 Lowest |
| 6.00 | Replastering with puffing fluff and cement mixture on the insulated area of high temperature steam pipe lines, valves, turbine casings and Strainer.( HP and IP casings and control valves) | 185 | M2 | 6,84,500 ₹8,07,710 | 5,36,315 ₹6,32,851.7 Lowest |
| 7.00 | Painting in HPT/IPT Casing and control valves areas including cost of paint. | 185 | M2 | 22,200 ₹26,196 | 17,945 ₹21,175.1 Lowest |
| 8.00 | Contractor scope of Materials
Ceramic Blanket 225mm thick Size 3.81 x 0.61 x 50mm | 77 | M2 | 4,23,500 ₹4,99,730 | 3,37,645 ₹3,98,421.1 Lowest |
| 9.00 | Ceramic Blanket 250mm thick Size 3.81 x 0.61 x 50mm | 108 | M2 | 6,69,600 ₹7,90,128 | 5,28,120 ₹6,23,181.6 Lowest |
| 10.00 | Wire Mesh Roll 90cm x 45m (1.9 Roll + 2.66 Roll) | 4.56 | Rolls | 11,400 ₹13,452 | 9,165.6 ₹10,815.41 Lowest |
Tender Value
Refer Docs
EMD Value
₹28,500
Closing Date
23 Feb 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II TM I Unit I Forthcoming Capital Overhaul Removal of Insulation over the HP IP casing and middle part of LP casing and re insulation over the same after completion of overhaul including supply of insulating material
2026_EB_659574_1
CE/TTPS/SE/M-II/No.470/2025-26
Open Tender
Miscellaneous Works
Item Rate
8 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹28,500
Yes
24 Jul 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of existing ceramic blanket insulation and re-insulation with 225mm thickness ceramic blanket over the HP and IP casing, Control Valves including supply of insulating material. | 77 | M2 | 55 | ₹4,235 |
| 2 | Removal of existing ceramic blanket insulation and re-insulation with 250mm thickness ceramic blanket over the HP & IP casing and Control Valves including supply of insulating material. | 108 | M2 | 55 | ₹5,940 |
| 3 | Removal of Double layer lagging and cladding in LP turbine middle part | 24.38 | M2 | 55 | ₹1,340.9 |
| 4 | Re-insulation of Double layer lagging and cladding in LP turbine middle part | 24.38 | M2 | 55 | ₹1,340.9 |
| 5 | Charges for disposal, cleaning and transportation of waste insulation material from work spot to ear marked area to dump. | 2 | Nos | 55 | ₹110 |
| 6 | Replastering with puffing fluff and cement mixture on the insulated area of high temperature steam pipe lines, valves, turbine casings and Strainer.( HP and IP casings and control valves) | 185 | M2 | 55 | ₹10,175 |
| 7 | Painting in HPT/IPT Casing and control valves areas including cost of paint. | 185 | M2 | 55 | ₹10,175 |
| 8 | Contractor scope of Materials
Ceramic Blanket 225mm thick Size 3.81 x 0.61 x 50mm | 77 | M2 | 55 | ₹4,235 |
| 9 | Ceramic Blanket 250mm thick Size 3.81 x 0.61 x 50mm | 108 | M2 | 55 | ₹5,940 |
| 10 | Wire Mesh Roll 90cm x 45m (1.9 Roll + 2.66 Roll) | 4.56 | Rolls | 55 | ₹250.8 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_791363.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .