Tender Value
₹82,000
EMD Value
₹1,000
Closing Date
11 Jul 2023, 3:00 pmClosed
Block Developement Officer Madathukulam
Block Developement Officer Madathukulam
Construction of compound wall at P.U.Middle School at Metrathi H/o Metrathi
2023_RDTN_335760_6
AGAMT 3083/2022/B2
Open Tender
Civil Works
Item Rate
Madathukulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,000
Yes
14 Jul 2023
5 Jul 2023
11 Jul 2023
5 Jul 2023
11 Jul 2023
5 Jul 2023
Amount
Construction of compound wall at PUE School at Metrathi H/o Metrathi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying standard specification.
Supply and erecting centering for sides and soffits upto 3.29m height including stutting and all labour charges etc.,complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"and conveyance of all materials to site and all labour charges etc complete -10 cum
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Name board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Krishnakumar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .