| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹5.0 L+₹5,312 (1.08%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SARAVANAN T L2 | P K BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 76 | m3 | 249 ₹18,924 | 246 ₹18,696 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 mix ( One Part of Cement Four Part of Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 13 | m3 | 5,595 ₹72,735 | 5,539 ₹72,007 Lowest |
| 3.00 | Supplying and Errecting Centering to Sides and Soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 Below Gound Level | 288 | m2 | 464 ₹1,33,632 | 459 ₹1,32,192 Lowest |
| 4.00 | Level | 14 | m2 | 1,033 ₹14,462 | 1,023 ₹14,322 Lowest |
| 5.00 | Plain Cement Concrete 1:3:6 Mix (One Part of Cement Three Part of Sand and Six Part of Aggregate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with standard. specifications.. TNDSS NO: 24 | 34 | m3 | 6,331 ₹2,15,254 | 6,268 ₹2,13,112 Lowest |
| 6.00 | Providing Granolithic Floor Finish of the following thickness with Plain Cement Concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 54 | m2 | 170 ₹9,180 | 167 ₹9,018 Lowest |
| 7.00 | Supplying Fabricating and Placing in Position of Steel Rods using TMT Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. TNDSS NO: 86 | 150 | Kg | 91 ₹13,650 | 89 ₹13,350 Lowest |
| 8.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part Cement One and Half Part Sand and Three Part of Aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 | 2 | m3 | 8,608 ₹17,216 | 8,522 ₹17,044 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
17 Sept 2025, 3:00 pmClosed
Executive Officer
Aravakurichi Town Panchayat
Construction of Storm Water Drain at East Street, Veduvar Street and Muthaliyar Street in Aravakurichi Town Panchayat, Karur District.
2025_DTP_603096_1
269/2025-4
Open Tender
Civil Works
Works
120 days
15TH FINANCE 2025-2026 Ist Installement
Construction of Storm Water Drain at East Street, Veduvar Street and Muthaliyar Street in Aravakurichi Town Panchayat, Karur District.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
6 Oct 2025
12 Sept 2025
17 Sept 2025
12 Sept 2025
17 Sept 2025
12 Sept 2025
12 Sept 2025 - 17 Sept 2025
Amount
Earthwork Excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Plain Cement Concrete 1:4:8 mix ( One Part of Cement Four Part of Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and Errecting Centering to Sides and Soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 Below Gound Level
Level
Plain Cement Concrete 1:3:6 Mix (One Part of Cement Three Part of Sand and Six Part of Aggregate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with standard. specifications.. TNDSS NO: 24
Providing Granolithic Floor Finish of the following thickness with Plain Cement Concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supplying Fabricating and Placing in Position of Steel Rods using TMT Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. TNDSS NO: 86
Reinforced Cement Concrete 1:1½:3 Mix (One Part Cement One and Half Part Sand and Three Part of Aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30
SARAVANAN T (BID ID -1462818)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .