Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC 00 00 NEAR OFFICERS MESS AIR FORCE JODHPUR RAJASTHAN 342011 | JODHPUR | RAJASTHAN | 342011 | L1 | Accepted-AOC Work Awarded to L1 bidder. | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 Bidder. Documents of L2 bidder not scrutinized, as bid of L1 bidder found acceptable technically and financially |
Tender Value
₹3.5 L
EMD Value
₹4,500
Closing Date
13 Mar 2024, 5:00 pmClosed
Project Engineer (EnM), Ashok
Ashok OCP, Piparwar Area Chatra, Jharkhand-829201
Job1. Erection of extra conductor for 3-phase power supply for submersible pumps installed at New Bijain and Karo rehab site PPR patch under Ashok OCP,PPRArea.
2024_CCL_303028_1
PO(AK)/PE(EnM)/e-NIT/23-24/117
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Ashok OCP, Piparwar Area Chatra, Jharkhand-829201
2 documents required · 2 mandatory
₹4,500
4 Jun 2024
28 Feb 2024
15 Mar 2024
28 Feb 2024
13 Mar 2024
28 Feb 2024
28 Feb 2024 - 6 Mar 2024
Amount
Job1.( Erection of extra conductor for 3-phase power supply for submersible pumps installed at New Bijain and Karo rehab site PPR patch under Ashok OCP,PPR Area.) Erection of steel pole of length exceeding 10 M but not exceeding 12 M in cement concrete (1 cement: 3 coarse sand:6 graded stone aggregate 40 mm nominal size) foundation including excavation and re-filling etc.
Erection/ of all Aluminium conductor of 7/2.11 mm to 7/3.00 mm diameter including binding etc as required.( 2 span 4 conductor rabbit of 50m av. Span length, Rabbit: 149.2 Kg/Km)
Supplying and erection of stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle ( 20 m X 60 cm ), 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.
Erection of Angle/Channel Iron(Bracket & clamp) cross Arm on steel tubler pole.
Supply ofClamps, bolts nuts(For bracket fixing) etc.
Supply and erection of 75mm x 90mm shakle insulator with GI Bolt, Nuts and straps etc
Supply and erection of 100mmX 65mm pin insulator complete with GI spindale and nuts etc
Supply of 8 SWG GI wire. (Note- Rate taken as per 6 swg GI wire from CPWD 2014 for per Kg for cradle guard)
Erection of 8 SWG GI wire as cradle guard including binding etc. ( for earth wire) Calculation: 1900 M*0.1Kg/M
Job2. relocation of 440v OH lighting line by dismantaling of 4 span and erection of 3 span near parking ppr patch under Ashok OCP (Route length-200M+ 150M).Erection of steel pole of length exceeding 10 M but not exceeding 12 M in cement concrete (1 cement: 3 coarse sand:6 graded stone aggregate 40 mm nominal size) foundation including excavation and re-filling etc.
Erection/ of all Aluminium conductor of 7/2.11 mm to 7/3.00 mm diameter including binding etc as required.( 2 span 4 conductor rabbit of 50m av. Span length, Rabbit: 149.2 Kg/Km)
Supplying and erection of stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle ( 20 m X 60 cm ), 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.
Erection of Angle/Channel Iron(Bracket & clamp) cross Arm on steel tubler pole.
Supply ofClamps, bolts nuts(For bracket fixing) etc.
Supply and erection of 75mm x 90mm shakle insulator with GI Bolt, Nuts and straps etc
Supply and erection of 100mmX 65mm pin insulator complete with GI spindale and nuts etc
Supply of 8 SWG GI wire. (Note- Rate taken as per 6 swg GI wire from CPWD 2014 for per Kg for cradle guard)
Erection of 8 SWG GI wire as cradle guard including binding etc. ( for earth wire) Calculation: 500 M*0.1Kg/M
Fabrication of Cradle Guard Brackets
Dismantling of tubular pole in cement concrete foundation etc. as required
Dismantling of over head line comprising of alumunium over head conductor , GI wire , cross arm insulator etc as required
Total impact of GST for the purpose of CTC
SIDDHI VINAYAK ENTERPRICES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .