Loading…
Loading…
Tender Value
₹49.1 L
EMD Value
₹1.2 L
Closing Date
1 Jul 2026, 5:00 pmClosed
DIRECTOR (H)
SECTOR-39, NOIDA
M/o Green belt (Re- Construction of Boundary wall in C- Block, Sector- 47) Noida.
2026_NOIDA_1161503_1
07/D(H)/DD(H)-II/2026-27
Open Tender
Civil Works - Others
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,124
NOIDA
₹1.2 L
18 Jun 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 21.34 | Cum | 930.43 | ₹19,855.38 |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 5 m initial lead, for all leads including all lifts involved. | 21.34 | Cum | 120.55 | ₹2,572.54 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (not exceeding 1.5m width or 10 Sqm on plan) including dressing of sides and ramming of bottums lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. All kined of soil. | 411.89 | Cum. | 144.95 | ₹59,703.46 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead upto 50 m and lift upto 1.5 m. | 411.89 | Cum. | 93 | ₹38,305.77 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 38.14 | Cum. | 5,746.88 | ₹2,19,186 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 4,316.51 | Kg. | 82.81 | ₹3,57,450.19 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 40.35 | Cum | 7,359.68 | ₹2,96,963.09 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 233.91 | sqm | 320.65 | ₹75,003.24 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 271.92 | Cum | 5,214.8 | ₹14,18,008.42 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 150 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) | 122.8 | Cum | 6,276.98 | ₹7,70,813.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_2177182.xls
BOQ • 0.30 MB
Capability.xls
Additional Documents • 0.05 MB
td7.pdf
Tender Documents • 5.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .