Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.3 L+₹7,731.85 (3.54%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.3 L+₹11,524.83 (5.28%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L3₹2.3 L+₹11,524.83 (5.28%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,840
Closing Date
18 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER RnB DIVISION
SUMBAL SONAWARI
Development/Filling of Premises /Public Park at Syed Mohalla Hajin.
2026_PWDJK_324395_1
NIT NO 53 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
Percentage
15 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division
₹5,840
24 Sept 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth filling in layers not exceeding 20 cm in depth, consolidating each deposited layer by rolling with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonne Capacity including loading, unloading all complete including carriage | 364 | cum | 650 | ₹2,36,600 |
| 2 | Providing and laying of stone soling hand packed tightly including watering, ramming and all carriages as involved upto site of work complete | 3.15 | Cum | 1,000 | ₹3,150 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level. M-7.5 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size crushed in foundation and under flooring, all work | 2.39 | Cum | 5,202.9 | ₹12,434.93 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all works upto plinth level: M-15 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size crushed ) | 1.67 | Cum | 5,733.6 | ₹9,575.11 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:-
Foundation ,footings,bases of columns | 7.32 | sqm | 286.35 | ₹2,096.08 |
| 6 | 12mm thick Cement Plaster on top and outer surface of side walls | 12.55 | sqm | 283.8 | ₹3,561.69 |
| 7 | Providing and laying interlocked tiles 50 mm th of approved make over 20 mm thick sand cushion | 25.09 | sqm | 900 | ₹22,581 |
| 8 | Carriage of Materials:
stone aggregate below 40 mm nominal size from Avg lead of 10 km | 3.86 | cum | 279.04 | ₹1,077.09 |
| 9 | Sand from Avg lead of 10 km | 2.14 | cum | 279 | ₹597.06 |
| 10 | Cement, Steel from an Avg lead of 1 km | 0.83 | MT | 114.44 | ₹94.99 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1094242.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .