Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.1 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹6.2 L+₹7,615.12 (1.25%)Rejected-Finance GOPALMATH DURGAPUR DIST PASCHIM BARDHAMAN PIN 713217 W B | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713217 | 2 | Rejected-Finance Quoted amount higher than L1 bidder | |
| 3 | 3₹6.2 L+₹15,425.92 (2.54%)Rejected-Finance 620 SURI ROAD KHASKENDA CHINCHURIA MORE POST BAHULA DIST BURDWAN WB | BAHULA | BURDWAN | WEST BENGAL | 713322 | 3 | Rejected-Finance Quoted amount higher than L1 bidder |
Tender Value
₹5.7 L
EMD Value
₹7,200
Closing Date
18 Sept 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AREA ENGINEER EnM
Sonepur Bazari Area
Erection of 3 phase, 4 wire system LT power line for illumination in Quarry 2B, 2A (part-B) and part (C) at S.B. Project.
2023_ECL_288075_1
GM/SBA/EnM/eTender/23-24/160
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Sonepur Bazari Area
Please refer tender documents.
6 documents required · 6 mandatory
₹7,200
20 Nov 2023
7 Sept 2023
20 Sept 2023
8 Sept 2023
18 Sept 2023
8 Sept 2023
8 Sept 2023 - 11 Sept 2023
Amount
Item Description/ Heading
Material Cost
Erection of 8/9 mtrs long PCC pole
Erection of 9/12/13/16 mtrs ST pole
Erection of MS iron bracket
Fixing of Shackle insulator
Drawing of ACSR rabbit conductor
Supply and Fixing of nuts, bolt etc
Supply and fixing of LT stay set complete
Supply and fixing of 500A fuse unit
Labour Cost:-
Erection of 8/9 mtrs long PCC pole
Erection of 9/12/13/16 mtrs ST pole
Erection of MS iron bracket
Fixing of Shackle insulator
Drawing of ACSR rabbit conductor
Fixing of nuts, bolt etc
Fixing of LT stay set complete
Installation of fencing and 6.6KV /440VTransformer
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
EVERGREEN ENTERPRISE
PINAK RANJAN SADHU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_298297.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .