Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹88.4 LAccepted-AOC 41 SARVODAYA INDUSTRIAL ESTATE OFF MAHAKALI CAVES ROAD NEAR PAPER BOX MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | ₹88.4 L | L-1 | Accepted-AOC Lowest L-1 Successful Bidder |
| 2 | L-2₹1.1 CrRejected-Finance 306 BAKSHI HOUSE NEHRU PLACE SOUTH DELHI DELHI 110019 INDIA | SOUTH | DELHI | 110019 | ₹1.1 Cr | L-2 | Rejected-Finance Unsuccessful Bidder |
| 3 | L-3₹1.3 CrRejected-Finance NO 3484 4TH H BLOCK 80FT ROAD BANASHANKARI 6TH STAGE RAGHUVANAHALLI RAGHUVANAHALLI BANGALORE KARNATAKA 560062 UDYAM KR 03 0043677 | BENGALURU URBAN | KARNATAKA | 560062 | ₹1.3 Cr | L-3 | Rejected-Finance Unsuccessful Bidder |
| 4 | L-4₹1.3 CrRejected-Finance 221 BISARIYA COMPLEX ZONE II M P NAGAR BHOPAL MADHYA PRADESH 462011 UDYAM MP 10 0005688 | BHOPAL | MADHYA PRADESH | 462011 | ₹1.3 Cr | L-4 | Rejected-Finance Unsuccessful Bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Meeting NIT Criteria |
| Sl No | Description | Qty | Unit | VOLKS ENERGIE PVT LTD L2 | Weartech Engineers Pvt Ltd L4 | GRAVITY INDIA TECHNOLOGIES PRIVATE LIMITED L3 | NETWORK TECHLAB INDIA LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00SH :- A : S.I.T.C. of P.A.C. | |||||||
| 2.00Supply of following capacity Floor Mounted, Top discharge and front return Air Cooled type Precision Air Condtioners . The Indoor units shall comprise of stepless variable capacity Digital/Inverter scroll compressor, Min. Two Sided Double skin side panels, with Class "O" Glasswool insulation, Top discharge type complete with dynamically balanced composite material fan driven by Electronically Commutated (EC) motor, hydrophilic coated slant/flat cooling coil. The unit shall be equipped with high efficiency filters(G4), micro processor based programmable logic controller, Liquid receiver, Expansion Valve, Drivers, suction and discharge piping, Internal power & control wiring, Water leak detector sensor, SS drain tray with nitrile rubber insulation, Stainless steel strip Heater, Infrared steam humidifier, Power and Control contactors and Other Electrical accessories. Provision to communicate with the BMS monitoring system through RS 485 communications protocol. The Outdoor Condenser units shall comprise of Condenser fans & motor, Condenser cooling coil with anti-corrosive coating (Copper coil with aluminium fins), Fan speed controller, Isolater switch The outdoor unit shall be selected at min. 38 Deg C of ambient temperatures with R-410A Refrigerant Gas. The units shall be suitable for operation on 415 Volts, 50 Hz, 3 Phase, 4 Wire AC supply. Each unit should be having individual display panel, which shall display date, time, actual & set values, operating conditions, signal faults, collective faults, limiting values and unit wellness alarm / service alarm to reduce the down time and unit memory shall hold the 400 most recent events with ID number, time and date stamp for each event. Operational & Control Features - Supply Air Set points & Operational Capabilities: 20 Deg.C +/- 2 Deg.C, 40% to 70% RH - Return Air Set points & Operational Capabilities: 22 Deg.C to 38 Deg C, 20% to 60% RH - P / PI / PID - All three Control logics for temperature control - Relative / Compensated / Predictive method for humidity control - Temperature & Humidity graphs for the system (Avg. value of all the connected units) & for each single unit - Record of Peak & Low temperature/humidity of the current day - Display shows SET / ACTUAL / SET+ACTUAL Values - Records total run hours for all main components - Team Mode operation for synchronising all machines in room without any external controller - Sequencing & Stand-by rotation - Cascading, Lead-Lag functions - Min. 16 days record of controlled parameters - Unit memory shall hold min. 200 recent alarms with date and time for each alarm - Status report of last 400 event logs - 3 types of access; User, Service & Advanced to protect all settings - Auto restart after a power failure - Graphical display of status of operation of all major components like Compressor, Fan, Heater & Humidifier on screen in an idle mode | |||||||
| 3.00 | i) 15.0 TR Total cooling capacity with minimum airflow of 16000 CMH, at minimum 20 Pa ESP, Return Air as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing).
(Note : The Supply of PAC Units followed by its installation are to be carried in the Operational Area of CSMI Airport, Mumbai. Required Tools, Machinary, permissions, Passes, etc. are to be arranged by the Agency) | 3 | Each | 13,05,000 ₹39.1 L | 16,64,662 ₹49.9 L | 16,05,210.48 ₹48.2 L | 8,77,450 ₹26.3 L |
| 4.00 | ii) 11.0 TR (or Equivalent) Total cooling capacity with minimum airflow of 16000 CMH, at minimum 20 Pa ESP, Return Air as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). | 3 | Each | 10,60,000 ₹31.8 L | 12,00,755.79 ₹36.0 L | 11,57,871.66 ₹34.7 L | 9,70,120 ₹29.1 L |
| 5.00SH :- B :Installation, Testing & Commissioning of PAC System | |||||||
| 6.00 | Installation, testing, and commissioning of 15.0 TR capacity Floor Mounted, Top discharge and front return type Air Cooled type Precision Air Condtioners including supply & fixing suitable adjutable GI/MS stands with rubber pad for each outdoor unit to dimension as specified / recommendation of O.E.M. (for Indoor and Outdoor units) including wiring, connection & interconnection making suitable for operation complete as required. Provision of Suitable Outdoor stand as per site including civil work if required for fixing of the stand. (Note: The Work is to be carried out in the Operational Area of C.S.M.I. Airport, Mumbai) | 3 | Job | 30,000 ₹90,000 | 64,349.6 ₹1.9 L | 62,051.4 ₹1.9 L | 52,858.6 ₹1.6 L |
| 7.00 | Installation, testing, and commissioning of 11.0 TR capacity Floor Mounted, Top discharge and front return type Air Cooled type Precision Air Condtioners including supply & fixing suitable adjutable GI/MS stands with rubber pad for each outdoor unit to dimension as specified / recommendation of O.E.M. (for Indoor and Outdoor units) including wiring, connection & interconnection making suitable for operation complete as required. Provision of Suitable Outdoor stand as per site including civil work if required for fixing of the stand. (Note :The Work is to be carried out in the Operational Area of C.S.M.I. Airport, Mumbai) | 3 | Job | 30,000 ₹90,000 | 57,349.6 ₹1.7 L | 55,301.4 ₹1.7 L | 47,108 ₹1.4 L |
| 8.00 | Supply, installation, testing of 18 SWG hard drawn copper refrigerant piping of sizes as per O.E.M. standard with insulation for precision units with proper "U" traps in piping for required length. All refrigerant piping along within conditioned space shall be provided with 9 mm. Class '0' Nitril Rubber insulation while rest pipework shall be provided with Nitrile Rubber Insulation & Anticorrosive coating and supports, between indoor and outdoor units. Each running meter of one circuit includes one meter of copper pipe (inlet & outlet), necessary supports, fittings, insulation, Thermogaurd coating, etc. and should connect the indoor to the outdoor as per locations.
(Including extension kit if required) | 60 | Meter | 4,000 ₹2.4 L | 4,289.6 ₹2.6 L | 4,136.4 ₹2.5 L | 3,523.6 ₹2.1 L |
| 9.00 | Supply & Installation of Motorized Damper with Actuator (of sufficient torque) & necessary control cablings for ON/OFF operation by interfacing with indoor unit operation and to be installed on indoor machines on Return Air path. | 6 | Each | 25,000 ₹1.5 L | 29,115 ₹1.7 L | 28,075 ₹1.7 L | 23,916 ₹1.4 L |
| 10.00 | Sequencing & logic control necessary timers and logic control for automatic start-stop of the unit.with necessary timers and logic control for automatic start-stop of the unit.Logic should include orderly restart after power failure. | 6 | Lot | 5,000 ₹30,000 | 4,289.6 ₹25,737.60 | 4,136.4 ₹24,818.40 | 3,523.6 ₹21,141.60 |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹4.0 L
Closing Date
9 Jan 2026, 6:00 pmClosed
Asstt.General Manager (Engg.-Elect.)
Airports Authority of India, Engineering Electrical Wing, Room No.-002, Ground Floor, ATS Complex, Sutar Pakhadi Road, Off.Sahar Road, Andheri (East), Mumbai - 400 099
Improvement of Air-conditioning at ELDIS-I and ELDIS-II at Operational Area at C.S.M.I.Airport, Mumbai.
2025_AAI_259097_1
MUM/ATS/ENGG-E/eNIT-04/2025-26
Open Tender
Electrical Works
90 days
Operational Area, C.S.M.I.Airport, Mumbai.
As per Tender Document and PQ Performa
6 documents required · 6 mandatory
₹1,180
₹4.0 L
O/o. A.G.M.(Engg.-Elect.)
18 Mar 2026
16 Dec 2025
12 Jan 2026
17 Dec 2025
9 Jan 2026
17 Dec 2025
17 Dec 2025 - 8 Jan 2026
8 Jan 2026
i) 15.0 TR Total cooling capacity with minimum airflow of 16000 CMH, at minimum 20 Pa ESP, Return Air as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing). (Note : The Supply of PAC Units followed by its installation are to be carried in the Operational Area of CSMI Airport, Mumbai. Required Tools, Machinary, permissions, Passes, etc. are to be arranged by the Agency)
ii) 11.0 TR (or Equivalent) Total cooling capacity with minimum airflow of 16000 CMH, at minimum 20 Pa ESP, Return Air as temperature at 28 +/-2 Deg C DB & 45% +/-5 RH (Non Condensing).
SH :- B :Installation, Testing & Commissioning of PAC System
Installation, testing, and commissioning of 15.0 TR capacity Floor Mounted, Top discharge and front return type Air Cooled type Precision Air Condtioners including supply & fixing suitable adjutable GI/MS stands with rubber pad for each outdoor unit to dimension as specified / recommendation of O.E.M. (for Indoor and Outdoor units) including wiring, connection & interconnection making suitable for operation complete as required. Provision of Suitable Outdoor stand as per site including civil work if required for fixing of the stand. (Note: The Work is to be carried out in the Operational Area of C.S.M.I. Airport, Mumbai)
Installation, testing, and commissioning of 11.0 TR capacity Floor Mounted, Top discharge and front return type Air Cooled type Precision Air Condtioners including supply & fixing suitable adjutable GI/MS stands with rubber pad for each outdoor unit to dimension as specified / recommendation of O.E.M. (for Indoor and Outdoor units) including wiring, connection & interconnection making suitable for operation complete as required. Provision of Suitable Outdoor stand as per site including civil work if required for fixing of the stand. (Note :The Work is to be carried out in the Operational Area of C.S.M.I. Airport, Mumbai)
Supply, installation, testing of 18 SWG hard drawn copper refrigerant piping of sizes as per O.E.M. standard with insulation for precision units with proper "U" traps in piping for required length. All refrigerant piping along within conditioned space shall be provided with 9 mm. Class '0' Nitril Rubber insulation while rest pipework shall be provided with Nitrile Rubber Insulation & Anticorrosive coating and supports, between indoor and outdoor units. Each running meter of one circuit includes one meter of copper pipe (inlet & outlet), necessary supports, fittings, insulation, Thermogaurd coating, etc. and should connect the indoor to the outdoor as per locations. (Including extension kit if required)
Supply & Installation of Motorized Damper with Actuator (of sufficient torque) & necessary control cablings for ON/OFF operation by interfacing with indoor unit operation and to be installed on indoor machines on Return Air path.
Sequencing & logic control necessary timers and logic control for automatic start-stop of the unit.with necessary timers and logic control for automatic start-stop of the unit.Logic should include orderly restart after power failure.
i) Width 300 mm. x Height 75 mm. x Thickness 1.0 mm.
ii) Width 150 mm. x Height 50 mm. x Thickness 0.7 mm.
i) 40 mm. diameter
Supply and laying of 3C x 2.5 Sq.mm. Cu. Flexible cable (Indoor to outdoor unit) on existing cable tray or surface as directed by EIC.
Supply & charging of Refrigerant Gas (R-410A) for the compressor for the 100 % rating and equivalent copper pipe length between Indoor & Outdoor Unit along with required oil for commisioning.
Supply and laying of Size 4C x 16 Sq.mm. armoured Copper cable from Incoming Isolator Panel to Indoor Unit on existing cable tray or surface as directed by EIC.
SH :- C : Supply and Fixing of G.I. duct i/c insulation and New Diffusers/ Grills.
Supply, installation, balancing and commissioning of fabricated at site GSS sheet metal rectangular/round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports, etc. as per approved drawings and specifications of following sheet thickness complete as required.
i) Thickness 0.63 mm. sheet (24 Gauge)
Dismantling of Existing 15 TR floor mounted PAC units (IDU and ODU) from ELDIS -II and Transporting of the same to ATS Complex. All Required Tools & plants, Vehicle with driver, Labous for loading and unloading, etc..
Dismantling of Existing 15 TR floor mounted Package Unit from ELDIS -I and Transporting of the same to ATS Complex. All Required Tools & plants, Vehicle with driver, Labous for loading and unloading, etc..
SH-D :- (A.I.C.M.C. - Annual Comprehensive Maintenance Contract of PAC)
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 6 Nos. (03 nos. 15 TR and 03 Nos. 11 TR) above work after completion of defect liability period of one year. The scope of work during C.M.C. Period shall be as per technical specifications. For First Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 6 Nos. (03 nos. 15 TR and 03 Nos. 11 TR) above work after completion of defect liability period of one year. The scope of work during C.M.C. Period shall be as per technical specifications. For Second Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 6 Nos. (03 nos. 15 TR and 03 Nos. 11 TR) above work after completion of defect liability period of one year. The scope of work during C.M.C. Period shall be as per technical specifications. For Third Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 6 Nos. (03 nos. 15 TR and 03 Nos. 11 TR) above work after completion of defect liability period of one year. The scope of work during C.M.C. Period shall be as per technical specifications. For Forth Year
Annual Comprehensive Maintenance Contract of above Floor mounted PAC i.e 6 Nos. (03 nos. 15 TR and 03 Nos. 11 TR) above work after completion of defect liability period of one year. The scope of work during C.M.C. Period shall be as per technical specifications. For Fifth Year
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.78 MB
BOQ_299696.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid