Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.0 LAccepted-Finance | L-1 | Accepted-Finance ACCEPT | |
| 2 | L-2₹8.1 L+₹1.1 L (15.6%)Accepted-Finance | L-2 | Accepted-Finance ACCEPT | |
| 3 | L-3₹9.1 L+₹2.1 L (29.6%)Accepted-Finance 108 BADA CHAKA NAINI ALLAHABAD | ALLAHABAD | PRAYAGRAJ | UTTAR PRADESH | L-3 | Accepted-Finance ACCEPT | |
| 4 | L-4₹10.0 L+₹3.0 L (42.8%)Accepted-Finance | L-4 | Accepted-Finance ACCEPT | |
| 5 | L-5₹10.5 L+₹3.6 L (50.8%)Accepted-Finance | L-5 | Accepted-Finance ACCEPT |
| Sl No | Description | Qty | Unit | SANDHYA TRADERS L4 | M/s Radha Krishan L6 | KHALSA CEMENT AGENCY L5 | KHUSHI ENTERPRISES L2 | Mars Construction and Associates L3 | VIJAY ELECTRICAL L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Carriage of Following Materials from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | |||||||||
| 2.00 | STP Pole 11 Mtr. Long | 28 | Nos. | - | - | - | - | - | - |
| 3.00 | PCC Pole 835 Mtr. Long | 22 | Nos. | - | - | - | - | - | - |
| 4.00 | Line material i.e. Stay Set, Stay Wire, TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material | 20 | Qtl. | - | - | - | - | - | - |
| 5.00 | ACSR Weasel Conductor | 1,690 | Mtrs. | - | - | - | - | - | - |
| 6.00 | ACSR Dog Conductor | 1,415 | Mtrs. | - | - | - | - | - | - |
| 7.00 | 3x150 Sqmm Alluminium LT XLPE Cable | 180 | Mtrs. | - | - | - | - | - | - |
| 8.00 | 11 Kv 3x70 Sqmm XLPE Cable | 300 | Mtrs. | - | - | - | - | - | - |
| 9.00 | Arial Bunch Cable Sutaible Size | 195 | Mtrs. | - | - | - | - | - | - |
| 10.00 | 3.5x70 Sqmm All. PVC Cable | 40 | Mtrs. | - | - | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
30 Jul 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC ETAWAH
STATION ROAD ETAWAH
32/EDCE/2025-26
2025_DVVNL_1059737_1
32/EDCE/2025-26
Open Tender
Repair and Maintenance Works
Item Wise
180 days
EDD I ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL.ORG
₹10,000
8 Sept 2025
25 Jul 2025
30 Jul 2025
25 Jul 2025
30 Jul 2025
25 Jul 2025
Carriage of Following Materials from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
STP Pole 11 Mtr. Long
PCC Pole 835 Mtr. Long
Line material i.e. Stay Set, Stay Wire, TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material
ACSR Weasel Conductor
ACSR Dog Conductor
3x150 Sqmm Alluminium LT XLPE Cable
11 Kv 3x70 Sqmm XLPE Cable
Arial Bunch Cable Sutaible Size
3.5x70 Sqmm All. PVC Cable
25 KVA Distribution Transformer
63 KVA Distribution Transformer
100 KVA Distribution Transformer
11 Kv CT/ PT Pole Mounting Unit Sutaible Size
11 KV Pilfer Proof Metering Cubical Sutaible Size
33 Kv 3P-4W TVM Energy Meter
Erection of Single support by ST/PCC pole including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support ST/PCC pole as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
Erection & Grouting of Double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Laying, sagging, stringing, binding & jumpering of ACSR Dog Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Laying, sagging, stringing, binding & jumpering of 3.5x70 Sqmm All. Cable on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Laying spreading, lifting and final sagging of Arial Bunched Cable (Sutaible size). including fixing of all accessories as per RESSPO Manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. :
Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Mounting of 100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Digging, laying and back filling of 3X150 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE/GI pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.
Filling Of 11 Kv 3x120 Sqmm Heat Shrinkable Cable Jointing Kit (Indoor Type) Suitable Size with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work)
Filling Of 11 Kv 3x120 Sqmm Heat Shrinkable Cable Jointing Kit (Outdoor Type) Suitable Size with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work)
Digging, laying and back filling of 3X70 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE/GI pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.
Filling Of 11 Kv 3x70 Sqmm Heat Shrinkable Cable Jointing Kit (Indoor Type) Suitable Size with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work)
Filling Of 11 Kv 3x70 Sqmm Heat Shrinkable Cable Jointing Kit (Outdoor Type) Suitable Size with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work)
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
Fixing & connecting of Earthing Rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
Safe carriage of CT/ PT Pole Mounting Unit and its proper installation on double poole after fixing of channel with M.S. clamps and nuts & bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. Strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO / AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
Safe carriage of 11 KV Pilfer Proof Metering Cubical sutaible size and its proper installation at pit site as per RESSPO Manuals
Safe carriage of 33 Kv 3P-4W TVM Energy Meter sutaible size and its proper installation at pit site as per RESSPO Manuals
Supply, Installation & Fixing of following accessories. including the cost of labour, T&P and carrier etc. required for proper completion of work.
11 Kv Fuse Set
MS Top Channel
11 Kv Pin Inshulator with Pin
Clamp with Nut & Bolt
11 Kv Cross Arm
MS Dropper Channel
11 Kv Disc Insulator
Nut & Bolt
T/F Base Angle Set
11 Kv T-Off Channel
Distribution Box Clamp
All. Lugs 120 Sqmm
I-Hook
Dead End Clamp
Suspention Clamp
Distribution Box 3 Phase
GI Pipe 6'' Dia
11 Kv F-Clamp for STP-55
MS Brecing Angle
33 Kv F-Clamp for STP-55
Red Oxide Paint
33 Kv Pin Insulator
33 Kv Disc Insulator
Alluminium Paint
PG Clamp for ACSR Dog
E-Bracket for STP-55
Stone Pad
33 Kv Cross Arm
33 Kv Coss Arm Holding Clamp
33 Kv Danger Board with clamp
Barbred Wire
33 Kv Top Channel
Guarding Angle
GI Wire 8 SWG
GI Wire 10 SWG
Distributi Box 1 Pahse
Pearcing Connector
LT Clamp with N&B
LT Shackel Insulator
Dropper Channel for 33 Kv
KHUSHI ENTERPRISES (BID ID -5389268)
Mars Construction and Associates (BID ID -5389890)
SANDHYA TRADERS (BID ID -5388916)
KHALSA CEMENT AGENCY (BID ID -5388929)
M/s Radha Krishan (BID ID -5388932)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .