Loading…
Loading…
Tender Value
₹13.4 L
EMD Value
₹26,700
Closing Date
6 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Removal of garbage in mid section of track at Villupuram Yard beyond 500 metre from the end of platform in Senior Section Engineer/Permanent way/VM for a period of two years.
TPJ-10-2026-11
TPJ-10-2026-11
Open
24 Months
Villupuram, Tamil Nadu
₹0
₹26,700
11 Jun 2026
11 Jun 2026
22 Jun 2026
shall quote unit rate). 4672000.0
0 TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
cotton pads, aluminium casseroles and any other miscellaneous catering refusals lying in the approaches of yards beyond 500 metre from the end of platform in mid section with in the railway premises by deploying sufficient men, to keep the track neat and tidy with necessary contractor's lookout men to safeguard against the traffic. Garbage and waste materials collected to be dumped only at the locations nominated by engineers's representative within the Railway limit. The location at which the pick up garbage in bags are temporarily collected should be maintained properly, neatly by the contractor without fouling the environment as directed by the engineers's representative and it has to be cleared by deploying contractor's men and machinery duly trucking out by the contractor's own road vehicles such as trucks and tractors and disposing the same away from the Railway's premises with contractor's men and machinery without infringing track/traffic movements and dumping at corparation/municipality dumping ground with an average lead of 10 km with all lead and lift and Charges if any etc.' complete by the contractor and as directed by the Engineer's representative.All labour, tool & plants, machinery, personal safety equipments such as uniforms, safety shoes, glouse etc'.vehicles like trucks/tractor and consumables stores, fuels, crew are to be supplied by the Tenderer/Contractor at hs own cost. VM Junction - Towards MS End at Km.162/000-161/600 (400m x 16m = 6400 Sqm per day).(Note:1. Manpower required per day is atleast 6 Nos between 07.00 hrs - 13.00 hrs and 14.00 hrs- 16.00 hrs. 2.Payment will be made to the Contractor for every two months from the date of commencement. 3.The SSE/P.way in charge will maintain a register on which the SSE or any other Railway staff under his control as nominated by him, will record the availablity of the labours and area covered. This register is only for official purpose. 4.All the contracts on Works/goods/services will be subject to the new GST Act as applicable from time to time. 5.The Contractor should ensure that the following protective gears to be provided to the labourers. a)Uniforms for labours.The color and design has to be approved by railways. b)Identity card with photo, c)Suitable foot wear, d) Gum boots, e) Illuminous jacket, f) Arm band, g)Cap, h)Face Mask (cloth), i)Gloves rubber cover upto elbow, j)First aid box, k)Rain coat. 6.Daily photographs shall be taken during the progress of work and shared in the special message group without fail. 7.In case the garbage is not cleaned satisfactorily, as observed by the Engineer-in- Charge, a penalty of 50% shall be imposed for that specific day, and the corresponding amount will be deducted from the payment.) 8760000.0
0 Description:- Collection and disposal of garbage such as plastic bags. bottles, cups, paper waste, cotton pads, aluminium casseroles and any other miscellaneous catering refusals lying in the approaches of yards beyond 500 metre from the end of platform in mid section with in the railway premises by deploying sufficient men, to keep the track neat and tidy with necessary contractor's lookout men to safeguard against the traffic. Garbage and waste materials collected to be dumped only at the locations nominated by engineers's representative within the Railway limit. The location at which the pick up garbage in bags are temporarily collected should be maintained properly, neatly by the contractor without fouling the environment as directed by the engineers's representative and it has to be cleared by deploying contractor's men and machinery duly trucking out by the contractor's own road vehicles such as trucks and tractors and disposing the same away from the Railway's premises with contractor's men and machinery without infringing track/traffic movements and dumping at corparation/municipality dumping ground with an average lead of 10 km with all lead and lift and Charges if any etc.' complete by the contractor and as directed by the
uniforms, safety shoes, glouse etc'.vehicles like trucks/tractor and consumables stores, fuels, crew are to be supplied by the Tenderer/Contractor at hs own cost.VM Junction - Towards TPJ End at Km.163/500-164/100 (600m x 20m = 12000 Sqm per day). (Note:1. Manpower required per day is atleast 6 Nos between 07.00 hrs - 13.00 hrs and 14.00 hrs- 16.00 hrs. 2.Payment will be made to the Contractor for every two months from the date of commencement. 3.The SSE/P.way in charge will maintain a register on which the SSE or any other Railway staff under his control as nominated by him, will record the availablity of the labours and area covered. This register is only for official purpose. 4.All the contracts on Works/goods/services will be subject to the new GST Act as applicable from time to time. 5.The Contractor should ensure that the following protective gears to be provided to the labourers. a)Uniforms for labours.The color and design has to be approved by railways. b)Identity card with photo, c)Suitable foot wear, d) Gum boots, e) Illuminous jacket, f) Arm band, g)Cap, h)Face Mask (cloth), i)Gloves rubber cover upto elbow, j)First aid box, k)Rain coat. 6.Daily photographs shall be taken during the progress of work and shared in the special message group without fail. 7.In case the garbage is not cleaned satisfactorily, as observed by the Engineer-in- Charge, a penalty of 50% shall be imposed for that specific day, and the corresponding amount will be deducted from the payment.) 4380000.0
0 TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY Description:- Collection and disposal of garbage such as plastic bags. bottles, cups, paper waste, cotton pads, aluminium casseroles and any other miscellaneous catering refusals lying in the approaches of yards beyond 500 metre from the end of platform in mid section with in the railway premises by deploying sufficient men, to keep the track neat and tidy with necessary contractor's lookout men to safeguard against the traffic. Garbage and waste materials collected to be dumped only at the locations nominated by engineers's representative within the Railway limit. The location at which the pick up garbage in bags are temporarily collected should be maintained properly, neatly by the contractor without fouling the environment as directed by the engineers's representative and it has to be cleared by deploying contractor's men and machinery duly trucking out by the contractor's own road vehicles such as trucks and tractors and disposing the same away
movements and dumping at corparation/municipality dumping ground with an average lead of 10 km with all lead and lift and Charges if any etc.' complete by the contractor and as directed by the Engineer's representative.All labour, tool & plants, machinery, personal safety equipments such as uniforms, safety shoes, glouse etc'.vehicles like trucks/tractor and consumables stores, fuels, crew are to be supplied by the Tenderer/Contractor at hs own cost. VM Junction - Towards PDY End at Km.0/400-1/000 (600m x10m = 6000 Sqm per day).(Note:1. Manpower required per day is atleast 6 Nos between 07.00 hrs - 13.00 hrs and 14.00 hrs- 16.00 hrs. 2.Payment will be made to the Contractor for every two months from the date of commencement. 3.The SSE/P.way in charge will maintain a register on which the SSE or any other Railway staff under his control as nominated by him, will record the availablity of the labours and area covered. This register is only for official purpose. 4.All the contracts on Works/goods/services will be subject to the new GST Act as applicable from time to time. 5.The Contractor should ensure that the following protective gears to be provided to the labourers. a)Uniforms for labours.The color and design has to be approved by railways. b)Identity card with photo, c)Suitable foot wear, d) Gum boots, e) Illuminous jacket, f) Arm band, g)Cap, h)Face Mask (cloth), i)Gloves rubber cover upto elbow, j)First aid box, k)Rain coat. 6.Daily photographs shall be taken during the progress of work and shared in the special message group without fail. 7.In case the garbage is not cleaned satisfactorily, as observed by the Engineer-in- Charge, a penalty of 50% shall be imposed for that specific day, and the corresponding amount will be deducted from the payment.)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BOCWWcessRBletterdt.02.01.2026.pdf
ATTACHMENT
GCC-April-2022updatedandCSNo-10.pdf
ATTACHMENT
SpecialconditionsforsubmissionofBG.pdf
ATTACHMENT
FormforPoliceverificationofcontractualstaff.pdf Verification for contractual staff
ATTACHMENT
JPO.pdf
ATTACHMENT
spcialconditioncommon-Garbage.pdf
ATTACHMENT
Annexure-V-VA-16082023.pdf
ATTACHMENT
SpecialConditions-updationoflabourdata.pdf
ATTACHMENT
annexurefortechnicalcomplaince18122022.pdf annexure for technical compliance
ATTACHMENT
PPEforsafetyinconstructionsite.pdf
ATTACHMENT
Tenderformfirstpagesecondpage.pdf
ATTACHMENT
annexureforcommercialcomplaince.pdf
ATTACHMENT
annexurefortechnicalcomplaince18122022.pdf
ATTACHMENT
FormforPoliceverificationofcontractualstaff.pdf
ATTACHMENT
Download all tender documents and submit your bid