| 1 | L1₹3.7 LAccepted-AOC 0 ADITYA ENTERPRISES 0 UNNAO HARDOI ROAD KISHORI KHERA UNNAO UTTAR PRADESH UNDER NAGAR PALIKA UNNAO UTTAR PRADESH 209801 | UNNAO | UTTAR PRADESH | 209801 | ₹3.7 L Quoted ₹2.9 L | L1 | Accepted-AOC ACCEPTED AS PER NIT |
| 2 | L2₹3.0 LRejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹3.0 L | L2 | Rejected-Finance REJECTED AS PER NIT |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | - | Rejected-Technical Rejected as per NIT |
| Sl No | Description | Qty | Unit | coalfields engineering works L2 | M/S ADITYA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.01 | 1. Cost of DGC Copper wire/strip 5mm Rs. 1180.00x2.67 kg=Rs.3150 per coil. (60 coil-60%)=24 | 24 | Coil | 3,496 ₹83,904 | 3,402 ₹81,648 |
| 1.02 | cost of moulding of one xoil with captan, nomax and mica or similar item =rs. 1450 per Coil (Total 60 coil) | 60 | Coil | 1,610 ₹96,600 | 1,565 ₹93,900 |
| 1.03 | Insulation cost | 1 | LS | 31,464 ₹31,464 | 30,618 ₹30,618 |
| 1.04 | Labour charges | 1 | LS | 31,464 ₹31,464 | 30,618 ₹30,618 |
| 1.05 | Repairing of bearing housing D.E (01 No) and N.D.E (1No.) by welding (metal filling) and machining as per the shape and size. | 2 | No | 13,210 ₹26,420 | 12,124 ₹24,248 |
| 1.06 | Alignment and balancing of both side (D.e and N.D.E) rotor shaft by cutting machaning and polishing using lathe machine and stone file etc. | 1 | No | 14,650 ₹14,650 | 7,086 ₹7,086 |
| 1.07 | Silver brazing of rotor bar with silver as filter metal. | 1 | Job | 17,375 ₹17,375 | 25,513 ₹25,513 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹3.2 L
EMD Value
₹4,100
Closing Date
16 Mar 2026, 4:00 pmClosed
Colliery Manager (M),Manager(F),Project Engineer(E
Colliery Manager (M),Manager(F),Project Engineer(E
Complete repairing of 200KW, 6.6KV Marathon make, Sl. No. F66752/2 motor along with its repair of the end cover Dala (D.E.) and rotor bar under Kathara Colliery.
2026_CCL_355698_1
KTC/PE/EnM/25-26/108 Date-06.03.2026
Open Tender
Electrical and Maintenance Works
30 days
Office of the Projec officer, Kathara Colliery
Complete repairing of 200KW, 6.6KV Marathon make, Sl. No. F66752/2 motor along with its repair of the end cover Dala (D.E.) and rotor bar under Kathara Colliery.
5 documents required · 5 mandatory
₹4,100
27 Mar 2026
6 Mar 2026
17 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
7 Mar 2026 - 13 Mar 2026
1. Cost of DGC Copper wire/strip 5mm Rs. 1180.00x2.67 kg=Rs.3150 per coil. (60 coil-60%)=24
cost of moulding of one xoil with captan, nomax and mica or similar item =rs. 1450 per Coil (Total 60 coil)
Insulation cost
Labour charges
Repairing of bearing housing D.E (01 No) and N.D.E (1No.) by welding (metal filling) and machining as per the shape and size.
Alignment and balancing of both side (D.e and N.D.E) rotor shaft by cutting machaning and polishing using lathe machine and stone file etc.
Silver brazing of rotor bar with silver as filter metal.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_368548.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid