Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance DHARASHIV OSMANABAD MAHARASHTRA 413501 | DHARASHIV | OSMANABAD | MAHARASHTRA | 413501 | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹2.7 L (2.63%)Admitted-Finance | ₹1.0 Cr+₹2.7 L (2.63%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹4.7 L (4.68%)Admitted-Finance | ₹1.1 Cr+₹4.7 L (4.68%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Jai Sai Construction L1 | V V Patil Constructions L2 | Mahesh Infrastructure L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete. | 195.6 | Per One Cubic Meter | 190 ₹37,164 | 201 ₹39,315.6 | 35 ₹6,846 Lowest |
| 2.00 | Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Laying By Grader/Paver. | 782.4 | Per One Cubic Meter | 2,600 ₹20,34,240 Lowest | 2,675 ₹20,92,920 | 3,000 ₹23,47,200 |
| 3.00 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-10 bulk bitumen rates are considered to arrive at rates) | 7,824 | Per One Sqaure metre | 21 ₹1,64,304 Lowest | 21 ₹1,64,304 Lowest | 30 ₹2,34,720 |
| 4.00 | BITUMINOUS MACADAM: Proving and laying bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80/100 mm compacted thickness with 3.4 % using specified grade of Bitumen. -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, vibratory roller.(VG-40 bulk bitumen rates are considered to arrive at rates) | 489 | Per One Cubic metre | 7,800 ₹38,14,200 | 7,910 ₹38,67,990 | 7,500 ₹36,67,500 Lowest |
| 5.00 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-10 bulk bitumen rates are considered to arrive at rates) | 7,824 | Per One Sqaure metre | 21 ₹1,64,304 Lowest | 21 ₹1,64,304 Lowest | 25 ₹1,95,600 |
| 6.00 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 2, premixed with bituminous binder @ 5.40 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 30-40 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-40 bulk bitumen rates are considered to arrive at rates) | 234.72 | Per One Cubic metre | 11,700 ₹27,46,224 | 12,050 ₹28,28,376 | 10,350 ₹24,29,352 Lowest |
| 7.00Supplying hard murum/ kankar at the road site, including conveying and stacking & spreading & compacting etc complete. B) Compacting H.M side shoulder. | ||||||
| 7.10 | a. | 756 | Per One Cubic metre | 858 ₹6,48,648 | 925 ₹6,99,300 | 700 ₹5,29,200 Lowest |
| 7.20 | b. | 5,040 | Per One Sqare meter | 18 ₹90,720 Lowest | 18 ₹90,720 Lowest | 50 ₹2,52,000 |
| 8.00 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils | 1,687.5 | Per One Cubic Meter | 90 ₹1,51,875 | 85 ₹1,43,437.5 | 50 ₹84,375 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
8 Nov 2021, 5:30 pmClosed
Executive Enginner N.H.Div Dhule
Executive Enginner N.H.Div Dhule
Malegaon kusumba dondaicha km 97.00 to 111.00 and 112.00 to 125.00
2021_MoRTH_652933_1
NIT-03/NO.1880/2021 Dt.11/10/21
Open Tender
Civil Works
Item Rate
180 days
Shahda
Tender Fee Through Bharatkosh and GST DD and EMD of FDR and TDR as per Tender Document
8 documents required · 8 mandatory
₹1,000
Bharatkosh
₹2.0 L
Yes
Pune
3 Feb 2022
13 Oct 2021
12 Nov 2021
13 Oct 2021
8 Nov 2021
13 Oct 2021
28 Oct 2021
Amount
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete.
Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Laying By Grader/Paver.
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-10 bulk bitumen rates are considered to arrive at rates)
BITUMINOUS MACADAM: Proving and laying bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80/100 mm compacted thickness with 3.4 % using specified grade of Bitumen. -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, vibratory roller.(VG-40 bulk bitumen rates are considered to arrive at rates)
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-10 bulk bitumen rates are considered to arrive at rates)
BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 2, premixed with bituminous binder @ 5.40 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 30-40 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-40 bulk bitumen rates are considered to arrive at rates)
Supplying hard murum/ kankar at the road site, including conveying and stacking & spreading & compacting etc complete. B) Compacting H.M side shoulder.
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils
Maintianance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair to cracks, parapet wall and protection work as per drawing etc. complete.
Trimmming of grass, shurbs and weeds from the shoulders/berm asnd disposing the same to suitable location etc. complete.
Royalty Charges as per Revenue and Forest Department's notification dated 11/05/2015 as Maharashtra Minor Mineral Extraction Rules, 2010 and as per insruction in general notes in SSR 2018-19 for items of lime stone, lime shell, stones, rubble, stone dust, shingles, gravel, murum, kankar and ordinary sand, ordinary clay, ordinary earth (to be used for embankment and filling), slate and shell etc. Spec. No.: As directed by Engineer-in-charge.
Laboratory testing charges
V V Patil Constructions
Mahesh Infrastructure
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .