Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LQualified 57 GEET MOHINI 6 AYODHYA NAGAR BHOPAL MADHYA PRADESH 462041 MP10A0007616 23AAQPE0457P1ZF R M | BHOPAL | MADHYA PRADESH | 462041 | ₹5.5 L | L1 | Qualified MSE, Category: OBC |
| 2 | L2₹9.3 LQualified | ₹9.3 L | L2 | Qualified MSE, Category: General |
| 3 | Disqualified 2358 AGGARSEN NAGAR 3RD SCHEME 2ND FLOOR GANGANAGAR GANGANAGAR SRI GANGANAGAR RAJASTHAN 335001 UDYAM RJ 15 0023404 | GANGANAGAR | RAJASTHAN | 335001 | - | - | Disqualified MSE, Category: General |
| 4 | Disqualified KH NO 63 PUNCHSEEL ENCLAVE BHOPURA NEAR KOYAL ENCLAVE GHAZIABAD UTTAR PRADESH 201102 UDYAM UP 29 0015772 09AAICC1115F1Z2 R M M M MII STATUS AS VERIFIED | GHAZIABAD | UTTAR PRADESH | 201102 | - | - | Disqualified MSE, Category: General |
| 5 | Disqualified 06 63 O K COMPLEX LAKHERAPURA BHOPAL BHOPAL MADHYA PRADESH 462001 | BHOPAL | MADHYA PRADESH | 462001 | - | - | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
5 Jan 2026, 3:00 pmClosed
Modular Toilet (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7045518 Dated : 26-12-2025 Bid Document 1/10 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 25 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8764126
GEM/2025/B/7045518
Two Packet Bid
Modular Toilet (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria
15 days
Nandwanshi464986gp kamton kansiya
Total value wise evaluation
PRODUCT
5 documents required · 5 mandatory
₹31
80%
Exempted
26 Dec 2025
26 Dec 2025
5 Jan 2026
Modular Toilet (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7045518 Dated : 26-12-2025 Bid Document 1/10 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 25 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8764126.pdf
GEM_BID
TNC_3ecfabc6-d79f-48b5-af0d1766738343799_PR-KAMTONKANSIYA-FFC-V-MGR.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid