Loading…
Loading…
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
4 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering Complex Budgam
Development of Eidgah by way of Fencing at Humhama Budgam
2026_PWDJK_310672_5
NIT_No_21_DB_2026-27
Open Tender
Civil Works
Percentage
20 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Budgam
₹6,000
4 Jun 2026
22 May 2026
5 Jun 2026
22 May 2026
4 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: | 5.5 | CUM | 1,458.45 | ₹8,021.48 |
| 2 | Providing and laying in position specified grade of cement concrete, including curing but excluding the cost of centering, shuttering, finishing and reinforcement. - All work cum upto plinth level 1:2:4 (1 cement: 2 coarse sand : 4graded stone aggregate 20 mm nominal size) | 9.35 | Cum | 6,591.25 | ₹61,628.19 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.87 | CUM | 7,104.35 | ₹20,389.48 |
| 4 | Steel reinforcement for RCC works including straightening, cutting, bending, binding and placing in position all complete TMT reinforcement of grade FE-500D steel bars at all levels | 287.1 | KG | 123.2 | ₹35,370.72 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 47.85 | SQM | 286.35 | ₹13,701.85 |
| 6 | 12 mm cement plaster of mix 1:4 (1 cement:4 fine sand) including all carriages | 155.03 | SQM | 283.8 | ₹43,997.51 |
| 7 | Carriage of materials from Mechanical transport from source to site of work | - | - | - | - |
| 8 | sand with 20kms lead | 1.23 | CUM | 409.94 | ₹504.23 |
| 9 | aggregates with 20km lead | 2.47 | CUM | 409.94 | ₹1,012.55 |
| 10 | Brickwork with common burnt clay(non-modular) bricks of class designation 7.5 incl curing in cement mortar 1:6 incl curing and carriage of matrial and also extra for brickwork in superstructure incl. all carriages | 11.01 | CUM | 9,500 | ₹1,04,595 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 1.31 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1004905.xls
BOQ • 0.28 MB
CorgdmNIT21.pdf
PDF • 1.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .