Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
5 Dec 2025, 5:00 pmClosed
PA ITDA Rayagada
PA ITDA Rayagada
Building work
2025_STSCD_121715_4
ITDARGDA 03/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
334 days
Rayagada
Please refer tender documents
3 documents required · 3 mandatory
₹10,000
₹1.2 L
Yes
26 Feb 2026
24 Nov 2025
8 Dec 2025
24 Nov 2025
5 Dec 2025
24 Nov 2025
24 Nov 2025 - 5 Dec 2025
Earth work in excavation of foundation trenches & Columns in all kinds of soil within all lead and lifts including dressing the sides, shoring (if nacessary), bailing out water and leveling the bed and depositing the excavated materials away from the work site including all costs of labour,sundries, tools & plants required for the work etc. complete as per direction of Engineer-in-Charge.(for septic Tank)
Filling in foundation and Plinth with sand well watered and rammed & dressed & level to proper gradient including all cost, conveyance, royalty taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer in Charge.
Cement concrete (1:3:6) with 4 cm. size hand broken hard granite metals of approved quality including mixing with concrete mixture, lowering & laying in layers not exceeding 300 mm. in depth, ramming compacting to proper thickness, watering, curing for required period including all cost, conveyance, royalty, taxes of all materials etc. complete as per the direction of Engineer-in-Charge. (for Septic Tank)
Rainforced cement concret M-20 grade using 20mm and down graded size crusher broken hard granite chips of approved quality including mixing with concrete mixture, including hoisting and laying in position & compacting with vibrateor to proper design section indlucing all the cost, conveyance, royalty & taxes of all materials, labour, rigid smooth centering, shuttering and dismantling the same after 28 days of casting, watering, curing etc. complete as per the direction of Engineer-in-Charge. A) Ground Floor i) Colum Base and Footing
ii) Column and Beam
iii) Plinth Band
iv) Round Lintel
v) Roof Slabs including septic Tank Slab
vi) Stair Case
vii) Chajjas
B) First Floor i) Columns & Beam
ii) Round Lintel
iii) Roof Slabs
iv) Stair Case
v) Chajjas
C) 2nd Floor i) Columns & Beam
ii) Roof Slabs
Supplying HYSD/Tor steel reinforcement from SAIL,VIZAG STEEL OR TATA STEEL brand of required diameter of approved quality including Labour charges for cutting, bending, binding and tying the grills and placing in position including cost, conveyance & taxes of reinforcements confirming to ISI standard and binding wire 18 to 20 gauge and as per drawing, design etc. complete as per the direction of Engineer-in-Charge. a) Ground Floor including septic tank
b) First Floor
c) 2nd Floor
Fly ash Bricks in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 kg/cm2 immersing the bricks in water not less than six hours before use in masonary including watering and curing for required period with all cost conveyance, royalty, taxes of all materials etc. complete as per the direction of Engineer-in-Charge. A) Plinth and Foundation
B) Superstructure a) Ground Floor
b) First Floor
c) 2nd Floor
16 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royalty taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge. a) Ground Floor
b) First Floor
c) 2nd Floor
12 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royalty taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge. a) Ground Floor
b) First Floor
c) 2nd Floor
2.5 cm thick A.S. Flooring using 12 mm size black crusher broken hard granite chips in C.C. (1:2:4) with punning, finished smooth with proper slope and thickness, watering, curing for required days with cost conveyance, royalty, taxes of all materials labour etc. complete as per the direction of Engineer-in-Charge. a) Ground Floor
Fixing vetrified tiles of Premium grade having thickness of 10mm confirming to IS 13756 of size 600mmx600mm color/printed series(Homogeneous) in floors, treads, steps, landings on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigaments to match the shades including cost of glazed tiles of size 0.6m x 0.6m a) Ground Floor
b) First Floor
Fixing glazed Ceramic floor tiles of Premium grade having thickness of 8mm confirming to IS 13755 of size 400mmx400mm Special Plain/printed series in floors, treads, steps, landings on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigaments to match the shades including cost of glazed tiles of size 0.3m x 0.3m a) Ground Floor
b) First Floor
Fixing glazed Ceramic wall tiles of Premium grade having thickness of 6.7mm confirming to IS 13753 of size 200mmx300mm Special Plain/printed series in dados,rise, walls etc on 12mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigaments to match the shades including cost of glazed tiles of size 0.2m x 0.3m a) Ground Floor
b) First Floor
16 mm thick cement plaster (1:6) over brickwork with cement punning for skirting and dadoes, finished smooth with proper thickness, watering, curing for required days with cost conveyance, royalty, taxes of all materials, labour etc. complete as per the direction of Engineer-in-Charge. a) Ground Floor including septic tank
6 mm thick cement plaster (1:4) over R.C.C works including deep chiping , finished smooth with proper thickness, watering, curing for required days with cost conveyance, royalty, taxes of all materials, labour etc. complete as per the direction of Engineer-in-Charge. a) Ground Floor
b) First Floor
Providing, fitting and fixing of M.S panelled doors double leaved shutters with M.S frames made out up the following materials conforming to relevant ISS, ISI frames:- 35 x 35 x 6mm M.S. Angles, shutter style:- Top & Bottom rall 25 x 25 x 3mm M.S Angle, door panel:-1mm CR Sheet. Panel stiffener covering width of each leaf:- 19.50mm, M.S.Flat 3 Nos. on each leaf. Hinges size:- 100mm 6 Nos.(3Nos of each side) but out as per ISS. Hold fast:- 35 x 35 x 6mm M.S Angle 175mm lenght bifurcated at the tip 3 nos of each side: Handle:19mm M.S Flat 4 nos. fabricated. Aldrop:- 2 nos. bought out as per ISS etc. complete as per the direction of Engineer-in-Charge.(EPM rate) a) Ground Floor
b) First Floor
Providing, fitting and fixing of M.S panelled windows double leaved shutters with M.S frames and grills made out up the following materials conforming to relevant ISS, ISI frames:- 35 x 35 x 6mm M.S. Angles, shutter style:- Top & Bottom rall 25 x 25 x 3mm M.S Angle, door panel:-1mm CR Sheet. Panel stiffener covering width of each leaf:- 19.50mm, M.S.Flat 2 Nos. on each leaf. Hinges size:- 100mm 4 Nos.(2Nos of each side) but out as per ISS. Hold fast:- 35 x 35 x 6mm M.S Angle 100mm lenght bifurcated at the tip 2 nos of each side: Handle:19.5mm M.S Flat 2 nos. fabricated (inside). Tower bolt:- 4 nos. bought out as per ISS, Grills -10mm M.S Squar bar @ 100mm spacing on both side etc. complete as per the direction of Engineer-in-Charge.(EPM rate) a) Ground Floor
b) First Floor
Providing fitting and fixing of WPC Door with frame etc complete with all labour etc complete. a) Ground Floor
b) First Floor
Labour for fitting and fixing of M.S gates, door frames and window frames as per approved designed etc complete including the cost of all fixing materials and labour etc. complete as per direction of Engineer-in-Charge. a) Ground Floor
b) First Floor
2.5cm thick grading concrete in C.C. (1:2:2) using 10mm & down graded crusher broken hard granite chips for roof making proper slope as per requirement on roof including the cost of all labour materials, leak proofing chemicals sico or equivalent as per ISI Code etc. complete as per the direction of Engineer-in-Charge. a) First Floor
Distempering two coats to walls with distemper of approved shade to give an even surface properly including cost conveyance, royalty taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer-in-charge, including the cost of all labour materials etc. complete a) Ground Floor
b) First Floor
c) 2nd Floor
Painting two coat to wall surface with weather paint of approved shade to give an even surface properly including cost conveyance, royalty taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer-in-charge, including the cost of all labour materials etc. complete a) Ground Floor
b) First Floor
c) 2nd Floor
Painting two coats of Asian/Burger or equivalent synthetic enamel paints over a coat of primer to Iron work after smoothening the surface by sand papering and filling the neet and holes with best quality of putty with cost, conveyanc, royalty, taxes of all materials labours etc. complete as per the direction of Engineer-in-Charge. a) Ground Floor
b) First Floor
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.20 MB
50_seated_PSH_at_Kinarimoda_Sevashram.pdf
Tender Documents • 0.34 MB
BOQ_566321.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .