Chief Engineer, Transmission (N.E.)
Pareshan Bhawan, Mohaddipur, Gorakhpur (UP) 273008
THE WORK OF DIVERSION HEIGHT RAISING OF 220 KV PGCIL MAHARAJGANJ DC LINE AT LOCATION NO 245 246 UNDER ELECTRICITY TRANSMISSION DIVISION II GORAKHPUR
2026_UPTCL_1103402_1
Short Term E-tender No-08-CE(TNE)/2025-26
Open Tender
Electrical Works
90 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
ZAO Transmission North East Gorakhpur
₹1.1 L
31 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
6 Jan 2026
1 Jan 2026
24 Fibre(DWSM) OPGW Fibre Optic Cable
Supply of Hardware set for 24 Fibre OPGW
Joint Box(24 Fibre)
TOWER ACCESSORIES-
Number Plate
Danger Plate
Circuit Plate (set of two)
Phase Plate in sets of red, blue and yellow
220KV Pipe type earthing material for towers
Bird Guard
PORCELAIN DISC INSULATORS
HARDWARE SUITABLE FOR ACSR ZEBRA
Single Tension fittings
Single Suspension fittings
Double Tension fittings
vibration Dampers
Mid Span compression Joint
Repair sleeves
WORK ASSOCIATED WITH CONSTRUCTION OF NEW LINE PORTION AND INTERCONNECTION WITH EXISTING LINE
PART-A (FOUNDATION WORKS)
Survey including preparation of schedule of materials, marking of locations(route length), GPS survey of linewith co-ordinates of each tower(the length of lineshall be authenticated by GPS Survey)
Soil Investigation Test (All kind of soil)
Check survey & Peg marking
Excavation of 220 KV Tower foundation including all earth work, back filling, leveling, watering and dewatering if necessary, preparing of crop and land compensation forms etc
Setting of stubs including of all foundation work but excluding the cost of concreting and excavation(Rate per location)for follwing towers
220 KV DA Zebra
220 KV DB Zebra
220 KV DC Zebra
Installation of steel reinforcement of concrete foundation including cost of steel bars, cuitting, bending & placing etc.
Concreting of foundaation including cost of arrangement of form boxes, shoring, shuttering & back filling, curing including the cost of cement, sand & stone ballast etc. But excluding cost of reinforcement bars.
1:2:4 concreting
PART-B (ERECTION/ STRINGING WORKS)
Transportation of all material from various stores under ETD-II Gorakhpur to site as required.
Erection of 220 KV towers including proper tightening, fixing/punching of number plates, phase plate & danger plates, bird guard, preparing of crop compensation forms etc.
Tack welding of all the bolts uo to height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrodes& application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower&Anchor tower
Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
Laying, stringing, tensioning clamping, jointing etc of ACSR Zebra conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 220 KV DC lines, preparing of crop compensation forms etc.
Laying, stringing, tensioning clamping, jointing,including fitting of all necessary Hardware and accessories of OPGW&OFAC,terminationat S/S,end to end connectivity&testing etc of 220 KV lines
PART-C (DISMANTLING WORKS)
Dismantling of 03 (Three) phases existing ACSR Zebra conductor all hardware fiting and conductor accessories e.g. Armour rod, vibration dampers, insulator strings etc of existing line and re-rolling of dismantled conductor are empty drum on re-use safety transportation of all removed material to UPPTCL store. (Quantity has been taken double for 06 phase)
De-stringing of 24 Fibre OPGW cable along with hardware fitting,joint box and its proper rolling
Dismantling and Stacking of 220 KV Double Circuit towers after cutting of bolt with all safety and precaution along with associated works. Dismantling of the tower is done piece by piece in a safe manner by removing the tack welding / punching, un-fastening the bolts &nuts in a systematic manner, the members so dismantled shall have to be in such a condition that the same can be re-used in future. To the maximum possible extent as cutting / cutting shall have to be avoided. Similarly, while de-stringing the materials are to be removed carefully without damage to the materials (Conductor/ Insulators / Hardware fittings etc.). The removed/released materials are to be re-used to the extent possible.
Dismantling of earlier foundation which includes Excavation,breaking of foundation upto 2 mtr depth and removing of concrete,cutting,removing of stubes and steel reinforcement,backfilling,levelling and making field suitaable for agriculture.
Transportation/Carriage of dismantled material (tower parts) from site to store at 220 KV S/S Mahrajganj along with loading, unloading, stacking
Construction of temporary site store, round the clock Watch & Ward of Dismantled tower, supplied materials at site store.
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
SBD08.pdf
Tender Documents • 5.31 MB
BOQ_2034791.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid