| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | ₹11.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.9 L+₹13,841.76 (1.17%)Rejected-Finance | ₹11.9 L+₹13,841.76 (1.17%) | L2 | Rejected-Finance L2 |
| 3 | L3₹11.9 L+₹15,390.04 (1.30%)Rejected-Finance | ₹11.9 L+₹15,390.04 (1.30%) | L3 | Rejected-Finance L3 |
| 4 | L4₹12.0 L+₹20,147.66 (1.71%)Rejected-Finance | ₹12.0 L+₹20,147.66 (1.71%) | L4 | Rejected-Finance L4 |
| 5 | L5₹12.5 L+₹68,355.79 (5.79%)Rejected-Finance | ₹12.5 L+₹68,355.79 (5.79%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Sathyaraj L1 | DHANAPAL L4 | Tamizhmani L3 | M KUMARESAN CONTRACTOR L2 | ANANDARAMAN L6 | Raguraman L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10mand lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) | 42.7 | cum | 230 ₹9,821 | 260 ₹11,102 | 287.42 ₹12,272.83 | 224.1 ₹9,569.07 | 240 ₹10,248 | 200 ₹8,540 Lowest |
| 2.00 | Filling with river M-Sand including cost and coveyance of all materials to work site and all labour charges etc. | 11 | cum | 1,900 ₹20,900 | 2,000 ₹22,000 | 2,198.14 ₹24,179.54 | 1,588.3 ₹17,471.3 | 1,500 ₹16,500 | 1,480 ₹16,280 Lowest |
| 3.00 | Supplying and filling of conveyed earth with a lead of 5Km for basement filling | 19.91 | cum | 42 ₹836.22 Lowest | 120 ₹2,389.2 | 2,198.25 ₹43,767.16 | 224.55 ₹4,470.79 | 430 ₹8,561.3 | 1,650 ₹32,851.5 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 10.98 | cum | 5,000 ₹54,900 | 5,800 ₹63,684 | 4,925.47 ₹54,081.66 | 5,189.1 ₹56,976.32 | 5,000 ₹54,900 | 4,300 ₹47,214 Lowest |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete | 10.73 | cum | 6,000 ₹64,380 | 6,000 ₹64,380 | 5,224.87 ₹56,062.86 | 5,759.89 ₹61,803.62 | 5,000 ₹53,650 | 4,900 ₹52,577 Lowest |
| 6.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 26.05 | cum | 6,000 ₹1,56,300 | 3,000 ₹78,150 Lowest | 4,135.18 ₹1,07,721.44 | 6,135.17 ₹1,59,821.18 | 5,000 ₹1,30,250 | 4,950 ₹1,28,947.5 |
| 7.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Up to Basement | 11.29 | cum | 9,000 ₹1,01,610 | 9,000 ₹1,01,610 | 6,500 ₹73,385 Lowest | 8,932.14 ₹1,00,843.86 | 8,500 ₹95,965 | 7,600 ₹85,804 |
| 8.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.For Super structure | 13.4 | cum | 9,000 ₹1,20,600 | 6,500 ₹87,100 | 5,741.58 ₹76,937.17 Lowest | 7,535.25 ₹1,00,972.35 | 8,500 ₹1,13,900 | 7,500 ₹1,00,500 |
| 9.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 40.57 | cum | 1,000 ₹40,570 | 547 ₹22,191.79 | 547.5 ₹22,212.08 | 635 ₹25,761.95 | 500 ₹20,285 Lowest | 500 ₹20,285 Lowest |
| 10.00 | For Column up to lintel, lintel alround Hall, Crosswall at Hall, Crosswall at Toilet, Crosswall at Kitchen, Door Bottom, Door Bottom D1, Door Bottom D2, Window bottom, Ventilator bottom V1, Front sunshade, Window sunshade, Loft for store, Toilet bottom, Toilet bottom, Toilet Roof sides, For Column up to Roof, Roof, Roof beam, Crosswall at Hall, Crosswall at Kitchen, Roof bottom, Roof Projection, Kitchen bottom, Store, T-Beam sides, T-Beam bottom, Roof slab Sides | 133.99 | Sqm | 400 ₹53,596 Lowest | 880 ₹1,17,911.2 | 978.14 ₹1,31,060.98 | 1,088.14 ₹1,45,799.88 | 950 ₹1,27,290.5 | 840 ₹1,12,551.6 |
Tender Value
₹17.1 L
EMD Value
₹17,100
Closing Date
8 Aug 2026, 3:00 pmClosed
BDO VP
Panchayat Union Annagramam
Construction of Anganwadi Building at Panapakkam Colony in Panapakkam Panchayat
2026_RDTN_687283_1
B4/ 1452 /2026 Annagramam VP
Open Tender
Civil Works
Works
Panchayat Union Annagramam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,100
Yes
Panchayat Union Annagramam
20 Aug 2026
21 Jul 2026
8 Aug 2026
21 Jul 2026
8 Aug 2026
21 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10mand lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) | - | cum | 246.52 | - |
| 2 | Filling with river M-Sand including cost and coveyance of all materials to work site and all labour charges etc. | - | cum | 1,897.8 | - |
| 3 | Supplying and filling of conveyed earth with a lead of 5Km for basement filling | - | cum | 5,602.3 | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | - | cum | 5,602.3 | - |
| 5 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete | - | cum | 5,602.3 | - |
| 6 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | - | cum | 5,602.3 | - |
| 7 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Up to Basement | 1 | cum | 5,602.3 | ₹5,596.7 |
| 8 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.For Super structure | - | cum | 5,602.3 | - |
| 9 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | - | cum | 5,602.3 | - |
| 10 | For Column up to lintel, lintel alround Hall, Crosswall at Hall, Crosswall at Toilet, Crosswall at Kitchen, Door Bottom, Door Bottom D1, Door Bottom D2, Window bottom, Ventilator bottom V1, Front sunshade, Window sunshade, Loft for store, Toilet bottom, Toilet bottom, Toilet Roof sides, For Column up to Roof, Roof, Roof beam, Crosswall at Hall, Crosswall at Kitchen, Roof bottom, Roof Projection, Kitchen bottom, Store, T-Beam sides, T-Beam bottom, Roof slab Sides | - | Sqm | 5,602.3 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_826102.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
techbit.pdf
Tender Documents • 0.34 MB
BOQ_826102.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .