Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 LAccepted-AOC | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L7₹34.9 L+₹2.8 L (8.66%)Accepted-AOC | L7 | Accepted-AOC NOT BEING LOWEST | |
| 3 | L8₹35.3 L+₹3.1 L (9.72%)Accepted-AOC | L8 | Accepted-AOC NOT BEING LOWEST | |
| 4 | L2₹32.8 L+₹64,335 (2.00%)Rejected-Finance 11 97 SADALATLIGUDA CHOWDARIGUDA HYDERABAD TELANGANA 500088 | MEDCHAL MALKAJGIRI | TELANGANA | 500088 | L2 | Rejected-Finance NOT BEING LOWEST | |
| 5 | L3₹33.3 L+₹1.1 L (3.42%)Rejected-Finance | L3 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | Santosh Popatrao Sarode L7 | Maruti Abhiyantriki L11 | Neha Enterprises L10 | Smruti Construction L5 | Deccan Enterprises L2 | Vinod Enterprises L12 | A B S ENTERPRISES L4 | Siddhant Hukumchand kumath L1 | M/S. AMERHAMZA GULAB SHAIKH L9 | MS. G.A. CONSTRUCTION L3 | Arihant Construction L6 | M/S Rudra Construction & Developers L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortor bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 520 | SQM | 75 ₹39,000 | 90 ₹46,800 | 80 ₹41,600 | 60 ₹31,200 | 80 ₹41,600 | 100 ₹52,000 | 100 ₹52,000 | 45 ₹23,400 | 38 ₹19,760 Lowest | 50 ₹26,000 | 50 ₹26,000 | 80 ₹41,600 |
| 2.00 | Demolition of cement concrete in ground floors and pavings not exceeding 15 cm thickness below or above ground level (unreinforced) complete all as specified and directed. | 70.5 | CUM | 500 ₹35,250 | 450 ₹31,725 | 420 ₹29,610 | 450 ₹31,725 | 450 ₹31,725 | 500 ₹35,250 | 150 ₹10,575 Lowest | 300 ₹21,150 | 350 ₹24,675 | 300 ₹21,150 | 500 ₹35,250 | 520 ₹36,660 |
| 3.00 | Demolition of reinforced cement concrete in ground floors and pavings not exceeding 15 cm thickness below or above ground level complete all as specified and directed. | 5 | CUM | 850 ₹4,250 | 650 ₹3,250 | 625 ₹3,125 | 450 ₹2,250 | 450 ₹2,250 | 600 ₹3,000 | 200 ₹1,000 Lowest | 350 ₹1,750 | 400 ₹2,000 | 350 ₹1,750 | 700 ₹3,500 | 900 ₹4,500 |
| 4.00 | M & L 75 mm thick PCC (1:2:4) type B2 using 40 mm graded stone aggregate as in hard standing finished even and smooth without using extra cement all as specified and directed | 200 | SQM | 550 ₹1,10,000 | 420 ₹84,000 | 350 ₹70,000 | 425 ₹85,000 | 500 ₹1,00,000 | 450 ₹90,000 | 600 ₹1,20,000 | 500 ₹1,00,000 | 500 ₹1,00,000 | 215 ₹43,000 Lowest | 350 ₹70,000 | 645 ₹1,29,000 |
| 5.00 | M & L hardcore of broken stone or boulders of guage exceeding 63 mm but not exceeding 100 mm deposited, spread and levelled in layers not exceeding 15 cm thick watered and rolled/rammed to a true surface complete all as specified and directed. | 45 | CUM | 1,300 ₹58,500 | 1,050 ₹47,250 | 800 ₹36,000 Lowest | 1,100 ₹49,500 | 1,800 ₹81,000 | 1,100 ₹49,500 | 3,500 ₹1,57,500 | 1,000 ₹45,000 | 1,100 ₹49,500 | 800 ₹36,000 Lowest | 1,000 ₹45,000 | 900 ₹40,500 |
| 6.00 | Supply only broken glass beads of size 60 to 80 mm (approx) fixed in plinth protection below concrete complete all as specified and directed. | 150 | KGS | 25 ₹3,750 | 50 ₹7,500 | 15 ₹2,250 Lowest | 30 ₹4,500 | 63 ₹9,450 | 30 ₹4,500 | 90 ₹13,500 | 20 ₹3,000 | 330 ₹49,500 | 100 ₹15,000 | 20 ₹3,000 | 35 ₹5,250 |
| 7.00 | M & L 75 mm thick PCC (1:3:6) type C2 using 40 mm graded stone aggregate as in plinth protection finished even and smooth using extra cement all as specified and directed. | 400 | SQM | 420 ₹1,68,000 | 425 ₹1,70,000 | 350 ₹1,40,000 | 485 ₹1,94,000 | 500 ₹2,00,000 | 450 ₹1,80,000 | 650 ₹2,60,000 | 370 ₹1,48,000 | 360 ₹1,44,000 | 185 ₹74,000 Lowest | 400 ₹1,60,000 | 420 ₹1,68,000 |
| 8.00 | M&L for forming contraction (Dummy) joints 65 mm deep x 10 mm wide, filled with sealing compound grade 'A' complete all as specified and directed. | 30 | PER 10 RM | 220 ₹6,600 | 310 ₹9,300 | 290 ₹8,700 | 850 ₹25,500 | 360 ₹10,800 | 290 ₹8,700 | 200 ₹6,000 | 120 ₹3,600 Lowest | 150 ₹4,500 | 600 ₹18,000 | 300 ₹9,000 | 310 ₹9,300 |
| 9.00 | M & L 75 mm thick PCC (1:4:8) type D2 using 40 mm graded stone aggregate as in sub base of floor finishes complete all as specified and directed. | 250 | SQM | 350 ₹87,500 | 320 ₹80,000 | 300 ₹75,000 | 320 ₹80,000 | 450 ₹1,12,500 | 340 ₹85,000 | 650 ₹1,62,500 | 310 ₹77,500 | 320 ₹80,000 | 170 ₹42,500 Lowest | 380 ₹95,000 | 340 ₹85,000 |
| 10.00 | M & L for 25 mm thick PCC (1:2:4) type B1 using 20 mm graded stone aggregate as in floor finishing complete all as specified and directed | 300 | SQM | 180 ₹54,000 | 170 ₹51,000 | 180 ₹54,000 | 160 ₹48,000 | 330 ₹99,000 | 180 ₹54,000 | 800 ₹2,40,000 | 125 ₹37,500 | 130 ₹39,000 | 140 ₹42,000 | 190 ₹57,000 | 100 ₹30,000 Lowest |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
5 Aug 2025, 6:00 pmClosed
GE I R AND D GIRINAGAR PUNE
GE I R AND D GIRINAGAR PUNE
REPAIRS TO GATES COMPOUND WALL FENCING JALI WORKS AND CERTAIN MISC B R WORKS AT VRDE AHMEDNAGAR 06
2025_MES_720819_1
GE I R AND D GNR TOKEN 33 OF 2025-2026
Open Tender
Civil Works
Item Rate
270 days
GE I R AND D GIRINAGAR PUNE
TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
Yes
GE I R AND D GIRINAGAR PUNE
₹70,000
Yes
19 Nov 2025
16 Jul 2025
7 Aug 2025
16 Jul 2025
5 Aug 2025
30 Jul 2025
16 Jul 2025 - 23 Jul 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .