Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
13 Oct 2026, 3:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Officer
Agaram Town Panchayat
Construction of One Class Room Building at Government Middle School at Kottur Avarampatty Ward no.14 in Agaram Town Panchayat
2026_DTP_709076_1
97/2026
Open Tender
Civil Works
Works
90 days
Agaram Town Panchayat
As Per Norms
2 documents required · 2 mandatory
₹0
₹15,000
29 Sept 2026
29 Sept 2026
13 Oct 2026
29 Sept 2026
13 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil and except hard rock requiring blasting including shoring, strutting, bailing water wherever necessary and all other incidental charges etc., complete as directed by departmental officers as per S.S.20B | 46 | Cum | - | - |
| 2 | Plain Cement Concrete 1:4:8 mix, (one part of cement, four part of sand and eight part of aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete and other incidental charges etc., complete. as per standard specification 28 V,VI S25 | 11 | Cum | - | - |
| 3Reinforced Cement Concrete 1:1.5:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | |||||
| 3.01 | Below Basement | 12 | Cum | - | - |
| 3.02 | Ground Floor | 15 | Cum | - | - |
| 4 | Supply and fabrication of steel using TMT rods for all Reinforced cement concrete works including cost and conveyance of all materials and all labour charges for cutting, bending and placing the rod in position and tying up the rods with binding wire and other incidental charges etc., complete. as per standard specification SS 86 & 86A V,VI, VII (S6) 7,3 | 2,429 | Kg | - | - |
| 5Supply and erection of steel centering, shuttering for soffits and sides including necessary support strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3mm for boarding laid over Silver Oak joists of size 10cmx6.5cm space at 10cm c/cand supported by Casurino Prop 10cm-13cm spaced at 75cm c/c etc., complete and as directed by Departmental Officers. | |||||
| 5.01 | Column Surface | 54 | Sqm | - | - |
| 5.02 | Shuttering | 45 | Sqm | - | - |
| 5.03 | Plain Surface | 94 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_852099.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .