Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹505.9 CrAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹520.5 Cr+₹14.7 Cr (2.90%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹728.0 Cr+₹222.2 Cr (43.9%)Rejected-Finance 7TH FLOOR KALPATARU SYNERGY OPP GRAND HYATT SANTACRUZ EAST MUMBAI 400055 MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400055 | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹728.6 Cr+₹222.8 Cr (44.0%)Rejected-Finance 3RD FLOOR BELAPUR BHAVAN SECTOR 11 CBD BELAPUR NAVI MUMBAI THANE MAHARASHTRA 400614 | THANE | MAHARASHTRA | 400614 | L4 | Rejected-Finance L4 Bidder | |
| 5 | L5₹753.3 Cr+₹247.5 Cr (48.9%)Rejected-Finance C 4 DISTRICT CENTRE SAKET NEW DELHI 110017 | SOUTH | DELHI | 110017 | L5 | Rejected-Finance L5 Bidder |
Tender Value
Refer Docs
EMD Value
₹1 Cr
Closing Date
5 Sept 2023, 3:00 pmClosed
GM IE and A
Plot No 143 RailTel Tower Sector 44 Gurugram Haryana India
Design Supply Installation Testing and Commissioning of 2x25kV 50Hz AC High Rise OHE Power Supply System and SCADA including ROCS in connection with laying of New BG Double Railway Line from Prithla to New Harsana Kalan Appx 320TKM of HORC Project
2023_HBC_287471_1
HORC/HRIDC/SYS-1/2023
Global Tenders
Electrical Works
Works
1460 days
Palwal Manesar Sonipat
Not Applicable
3 documents required · 3 mandatory
₹0
₹1 Cr
Yes
Gurugram
13 Aug 2024
2 Jun 2023
5 Sept 2023
2 Jun 2023
5 Sept 2023
17 Aug 2023
2 Jun 2023 - 15 Jun 2023
17 Jun 2023
Schedule A: Lumpsum component of Works
Description of Work / Item(s)
Schedule 'B': OHE works for IR Connectivity and Feeder (Harsana Kalan IR SSP to New Harsana Kalan OHE)
Sub-Schedule B1: General
Sub-Schedule B2: Concrete
Sub-Schedule B3: Ferrous
Sub-Schedule B4: Non Ferrous
Sub-Schedule B5: Catenary and Contact Wire
Sub-Schedule B6: Insulators
Sub-Schedule B7: SCADA at Harsana Kalan IR SSP
Sub-Schedule B8: Non-Schedule (NS) Items
Description of Work / Item(s)
Schedule A: Lumpsum component of Works
Schedule B: OHE works for IR Connectivity and feeder (Harsan Kalan IR SSP to New Harsana Kalan OHE)
Provisional Sum
Rail Vikas Nigam Limited
Kalpataru Projects International Ltd
Konkan Railway Corporation Limited
IRCON INTERNATIONAL LIMITED
KEC International Limited
Rail Vikas Nigam Limited
Konkan Railway Corporation Limited
Kalpataru Projects International Ltd
IRCON INTERNATIONAL LIMITED
KEC International Limited
Rail Vikas Nigam Limited
Kalpataru Projects International Ltd
Konkan Railway Corporation Limited
IRCON INTERNATIONAL LIMITED
KEC International Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_361255.xls
BOQ Document • 0.38 MB
122191987.pdf
Tender Document • 0.14 MB
SYS1RFPPART1.pdf
Tender Document • 2.07 MB
SYS1RFPPART2.pdf
Tender Document • 32.54 MB
SYS1RFPPART3.pdf
Tender Document • 0.86 MB
SYS1FINANCIALPARTPDF.pdf
Tender Document • 2.81 MB
122191989.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .