Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 CrAccepted-Finance AT BORIA PO KESINGA DIST KALAHANDI PIN NO 766012 | BORIA | KALAHANDI | ODISHA | 766012 | 1 | Accepted-Finance SELECTED IN LOTTERY | |
| 2 | 2₹7.3 CrSame as 1Rejected-Finance AT KHARIAR PO KHARLAR DIST NUAPADA | 2 | Rejected-Finance REJECTED | |
| 3 | 2₹7.3 CrSame as 1Rejected-Finance | 2 | Rejected-Finance REJECTED | |
| 4 | 2₹7.3 CrSame as 1Rejected-Finance AT KESINGA PO PS KESINGA DIST KALAHANDI | KESINGA | KALAHANDI | ODISHA | 2 | Rejected-Finance REJECTED | |
| 5 | 2₹7.3 CrSame as 1Rejected-Finance KHIJRI NAMKUM RANCHI JHARKHAND 834010 | RANCHI | JHARKHAND | 834010 | 2 | Rejected-Finance REJECTED |
Tender Value
₹8.6 Cr
EMD Value
₹8.6 L
Closing Date
15 Oct 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Construction Engineer
O/o the CCE, RW Circle, Bhawanipatna
Improvement to Rupra to Palsapada Rupra to Palaspada Road PWD Road (Lakhguda) Bhimkela Road in the district of Kalahandi under MMSY-Improvement to Existing RD Roads for the year 2024-25.
2025_CERWI_118322_8
BPT/Online-10/2025-26
National Competitive Bid
Civil Works - Roads
Percentage
365 days
kesinga
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹8.6 L
Yes
13 Jun 2026
25 Sept 2025
16 Oct 2025
25 Sept 2025
15 Oct 2025
25 Sept 2025
25 Sept 2025 - 15 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in –charge. | 30,976 | Sqm | 8.26 | ₹2,55,861.76 |
| 2 | Dismantling of Cement Concrete Grade M-15 & M20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 151.55 | Cum | 638.03 | ₹96,693.45 |
| 3 | Dismantaling of of Brick / stone masonary in cement mortar above 3 mtr height for existing structures including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviciable materials and stacking the serviciable materials with all lifts and lead of 1000 m as per specification and as per the direction of Engineer-in-charge. | 19.8 | Cum | 1,669.6 | ₹33,058.08 |
| 4Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | |||||
| 4.1 | Upto 600mm dia | 30 | Rm | 285.24 | ₹8,557.2 |
| 4.199999999999999 | 600mm to 900mm dia | 22.5 | Rm | 383.83 | ₹8,636.18 |
| 5 | Scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. and as per the direction of Engineer-in-charge. | 18,585.6 | Sqm | 6 | ₹1,11,513.6 |
| 6 | Reworking the scarified bituminus surface suitably after supplementing the base materials with stone screened dust compacting finished surface as per Clause No 501.8.3.2 of Mort &H specification for raod & Bridge works (4th Revision) and as per the direction of Engineer-in-charge. | 23,232 | Sqm | 17.98 | ₹4,17,711.36 |
| 7 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. | 35,301.54 | Cum | 200.88 | ₹70,91,373.36 |
| 8 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 7,675.04 | Cum | 50.34 | ₹3,86,361.51 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.41 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_553218.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .