Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.6 CrAccepted-AOC 3D VATIKA APARTMENT LINE TANK ROAD RANCHI JHARKHAND | RANCHI | RANCHI | JHARKHAND | 834001 | L1 | Accepted-AOC L1 Letter No. 4553(S)WE Date-14.12.2022 | |
| 2 | L2₹49.3 Cr+₹3.8 Cr (8.30%)Rejected-Finance 15B SEVAK BAIDYA STREET SEVAK BAIDYA STREET KOLKATA WEST BENGAL 700029 | KOLKATA | WEST BENGAL | 700029 | L2 | Rejected-Finance L2 Letter No. 4553(S)WE Date-14.12.2022 | |
| 3 | L3₹49.5 Cr+₹3.9 Cr (8.59%)Rejected-Finance FLAT NO 207 LUMBINI ENCLAVE OPP NIMS PANJAGUTTA HYDERABAD 500082 | HYDERABAD | HYDERABAD | TELANGANA | 500082 | L3 | Rejected-Finance L3 Letter No. 4553(S)WE Date-14.12.2022 | |
| 4 | L4₹51.0 Cr+₹5.4 Cr (11.9%)Rejected-Finance | L4 | Rejected-Finance L4 Letter No. 4553(S)WE Date-14.12.2022 | |
| 5 | L5₹51.6 Cr+₹6.1 Cr (13.3%)Rejected-Finance ASHOK KUNJ OPPOSITE ROAD NO 3 ASHOK NAGAR RANCHI | RANCHI | JHARKHAND | 829205 | L5 | Rejected-Finance L5 Letter No. 4553(S)WE Date-14.12.2022 |
| Sl No | Description | Qty | Unit | M/S SANJAY CONSTRUCTION L10 | CLASSIC ENGICON PVT. LTD. L1 | RAJBIR CONSTRUCTION PVT. LTD. L6 | ms m and s company L2 | M/S PUJA ENTERPRISES L4 | M/s Ganesh Yadav L8 | Spica Projects and Infrastructures Pvt Ltd L5 | East India Construction Co. L7 | RNS CONSTRUCTION PRIVATE LIMITED L9 | RK Infracorp Private Limied L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer. In area of light jungle | 13.87 | HEC | 1,59,968 ₹22,18,756.16 | 22,000 ₹3,05,140 | 30,000 ₹4,16,100 | 30,000 ₹4,16,100 | 2,000 ₹27,740 Lowest | 12,000 ₹1,66,440 | 40,000 ₹5,54,800 | 26,000 ₹3,60,620 | 1,60,000 ₹22,19,200 | 5,000 ₹69,350 |
| 2.00 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. Girth from 300 mm to 600 mm | 9 | Each | 384 ₹3,456 | 150 ₹1,350 | 199 ₹1,791 | 49 ₹441 | 1 ₹9 Lowest | 100 ₹900 | 100 ₹900 | 50 ₹450 | 500 ₹4,500 | 50 ₹450 |
| 3.00 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.Girth from 600 mm to 900 mm | 13 | Each | 622 ₹8,086 | 200 ₹2,600 | 333 ₹4,329 | 50 ₹650 | 1 ₹13 Lowest | 120 ₹1,560 | 125 ₹1,625 | 100 ₹1,300 | 600 ₹7,800 | 50 ₹650 |
| 4.00 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.. Girth from 900 mm to 1800 mm | 70 | Each | 1,104 ₹77,280 | 300 ₹21,000 | 681 ₹47,670 | 50 ₹3,500 | 1 ₹70 Lowest | 130 ₹9,100 | 150 ₹10,500 | 1,000 ₹70,000 | 1,150 ₹80,500 | 50 ₹3,500 |
| 5.00 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.. Girth above 1800 mm | 9 | Each | 2,208 ₹19,872 | 350 ₹3,150 | 1,321 ₹11,889 | 50 ₹450 | 1 ₹9 Lowest | 150 ₹1,350 | 175 ₹1,575 | 1,500 ₹13,500 | 2,300 ₹20,700 | 50 ₹450 |
| 6.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. By Mechanical Means. Cement Concrete Grade M-15 & M-20 | 110.12 | cum | 717 ₹78,956.04 | 350 ₹38,542 | 345 ₹37,991.4 | 500 ₹55,060 | 1 ₹110.12 Lowest | 703 ₹77,414.36 | 350 ₹38,542 | 500 ₹55,060 | 725 ₹79,837 | 100 ₹11,012 |
| 7.00 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia | 15 | M | 875 ₹13,125 | 750 ₹11,250 | 210 ₹3,150 | 500 ₹7,500 | 1 ₹15 Lowest | 100 ₹1,500 | 250 ₹3,750 | 500 ₹7,500 | 830 ₹12,450 | 100 ₹1,500 |
| 8.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 65,624.3 | cum | 69 ₹45,28,076.7 Lowest | 110 ₹72,18,673 | 150 ₹98,43,645 | 100 ₹65,62,430 | 114 ₹74,81,170.2 | 116 ₹76,12,418.8 | 130 ₹85,31,159 | 110 ₹72,18,673 | 75 ₹49,21,822.5 | 150 ₹98,43,645 |
| 9.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Rate per cum after adding royalty@Rs 27.48/cum | 59,335.78 | cum | 68 ₹40,34,833.04 | 160 ₹94,93,724.8 | 100 ₹59,33,578 | 100 ₹59,33,578 | 114 ₹67,64,278.92 | 55 ₹32,63,467.9 Lowest | 140 ₹83,07,009.2 | 110 ₹65,26,935.8 | 75 ₹44,50,183.5 | 150 ₹89,00,367 |
| 10.00 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For grading-I Material | 19,318.24 | cum | 2,465 ₹4,76,19,461.6 | 1,750 ₹3,38,06,920 | 1,750 ₹3,38,06,920 | 1,500 ₹2,89,77,360 Lowest | 1,850 ₹3,57,38,744 | 2,000 ₹3,86,36,480 | 1,850 ₹3,57,38,744 | 1,900 ₹3,67,04,656 | 2,430 ₹4,69,43,323.2 | 1,900 ₹3,67,04,656 |
Tender Value
₹55.6 Cr
EMD Value
₹55.6 L
Closing Date
3 Sept 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, RCD, Road Division, Bokaro
Executive Engineer, RCD, Road Division, Bokaro
Widening and Strengthening Work in Four Lane of Road from I.T.I. More to Ukrid More (Total Length 8.670 km) for the year 2022-23 under Road Division, Bokaro
2022_CECOM_60892_1
RCD/ BOKARO/ 939
Open Tender
Civil Works
Item Rate
450 days
I.T.I. More to Ukrid More
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Executive Engineer, RCD, Road Division, Bokaro
₹55.6 L
C.E. (Comm), RCD, Jharkhand, Ranchi
15 Dec 2022
20 Aug 2022
7 Sept 2022
20 Aug 2022
3 Sept 2022
20 Aug 2022
26 Aug 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer. In area of light jungle | 13.87 | HEC | - | - |
| 2 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. Girth from 300 mm to 600 mm | 9 | Each | - | - |
| 3 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.Girth from 600 mm to 900 mm | 13 | Each | - | - |
| 4 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.. Girth from 900 mm to 1800 mm | 70 | Each | - | - |
| 5 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.. Girth above 1800 mm | 9 | Each | - | - |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. By Mechanical Means. Cement Concrete Grade M-15 & M-20 | 110.12 | cum | - | - |
| 7 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia | 15 | M | - | - |
| 8 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 65,624.3 | cum | - | - |
| 9 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Rate per cum after adding royalty@Rs 27.48/cum | 59,335.78 | cum | - | - |
| 10 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For grading-I Material | 19,318.24 | cum | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_82142.xls
BOQ Document • 0.32 MB
103733667.pdf
Tender Document • 0.35 MB
sbd939.pdf
Tender Document • 1.71 MB
103733671.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .