Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC as per uploded | |
| 2 | L2₹9.8 L+₹72,671 (7.99%)Rejected-Finance 201 MAJNAWAN FAIZABAD SADAR FAIZABAD 224001 | FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | L2 | Rejected-Finance As per uploded | |
| 3 | L3₹11.0 L+₹1.9 L (20.7%)Rejected-Finance | L3 | Rejected-Finance As per uploded | |
| 4 | L4₹11.5 L+₹2.4 L (26.8%)Rejected-Finance 65 NEWAS GORAKHPUR GORAKHPUR GORAKHPUR UTTAR PRADESH 273209 | GORAKHPUR | UTTAR PRADESH | 273209 | L4 | Rejected-Finance As per uploded |
Tender Value
₹15.3 L
EMD Value
₹1.5 L
Closing Date
19 Dec 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER SNK 1 BANSI
EXECUTIVE ENGINEER SNK 1 BANSI
CONSTRUCTING V.R.B. CUM FALL AT KM 0.250 OF SUCHITA KRIPLANI ESCAPE
2020_UPIDC_537455_1
02/EE/2020-21 SNK1Bansi lot 04
Open Tender
Civil Works
Item Rate
60 days
EXECUTIVE ENGINEER SNK 1 BANSI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹1.5 L
Yes
19 Feb 2021
14 Dec 2020
19 Dec 2020
14 Dec 2020
19 Dec 2020
14 Dec 2020
90 days
Amount
E/w in excavation of foundation including back filling in all type of soil with all lead , lift ,dressing and manual compaction etc. complete. all Taxes but excluding GST
Laying cement concrete 1:3:6 in foundation with chopan coarse sand & crushed coarse aggregate 4.75 to 40 mm including cost of all material labour and T& P etc. complete for completion of work. all Taxes but excluding GST
1st class Brick work in 1:4 cement mortar with chopan coarse sand including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
R.C.C 1:1.5:3 with chopan coarse sand and crushed stone grit 4.75 to 20 mm including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
Steel reinforcement including cutting bending , binding and placing in position including cost of of binding wire labour and T&P etc. complete for completion of work. all Taxes but excluding GST
Centering and shuttering for C.C work including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
Centering and shuttering for R.C.C work including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
S/F Tar paper bearing on top of abutment & pier cap including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
Laying C.C 1:1.5:3 with chopan coarse sand and crushed stone grit 10 to 20 mm including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
Supplying and fixing joint filler board 20 mm thick for expansion joints gap including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
Struck /deep pointing in 1:2 cement mortar including cost of all material labour and T&P etc. complete for completion of work. all Taxes but excluding GST
M/S V.K. CONSTRUCTION
M/S PREMLATA UPADHYAY
M/S GOVIND CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .