| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹2.0 L+₹3,926.88 (2.01%)Accepted-Finance | L2 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | J.Azaruddin L1 | Jayadhitya Groups L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 16.8 | M3 | 102 ₹1,713.6 Lowest | 104.86 ₹1,761.58 |
| 2.00 | Supplying and filling in foundation and basement with stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 12.6 | M3 | 323 ₹4,069.8 Lowest | 329.46 ₹4,151.2 |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 12.6 | M3 | 5,432.16 ₹68,445.22 Lowest | 5,540.8 ₹69,814.12 |
| 4.00 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. | 84 | M² | 1,302.8 ₹1,09,435.2 Lowest | 1,328.86 ₹1,11,623.9 |
| 5.00 | Providing rain water harvesting using 6 No.of RCC well rings of 90cm inner dia (clear) with 5cm wall thickness made out of cement concrete 1:2:4 using 20mm hard broken jelly to a height of 30cm each supplying and fabricating 16 No. of 6mm dia MS rod vertically and 3 No. of 6mm dia MS rod circumferentially tied together with 18 guage binding wire for well rings including necessary earth work excavation 1m dia to a depth of 1m, supplying and filling 40mm HBG inside the erected well ring to a depth of 90cm, and top covered with RCC circular perforated cover slab of 1m dia and 5cm thick which inclusive of cost and fabrication of 6mm M.S reinforcement at 15 cm spacings on both directions and one 6mm M.S rod ties at the edge of the slab circumferentially including cost of moulding, curing, finishing and well placing in position and disposing off excavated earth with all initial leads and lifts in places as shown by the Departmental officers etc., complete in all respects. | 2 | Nos | 5,997.53 ₹11,995.06 Lowest | 6,117.48 ₹12,234.96 |
Tender Value
₹2.4 L
EMD Value
₹2,400
Closing Date
23 Sept 2025, 3:00 pmClosed
THE COMMISSIONER
AVADI CITY MUNICIPAL CORPORATION
Providing Paver Blocks at Leftout area in Telugu Colony Primary School in ward 1
2025_MAWS_606772_1
Roc No.8826/2025/E1/Z1/3
Open Tender
Civil Works
Fixed-rate
60 days
ward 1
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,400
20 Feb 2026
23 Sept 2025
23 Sept 2025
23 Sept 2025
23 Sept 2025
23 Sept 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Supplying and filling in foundation and basement with stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,.
Providing rain water harvesting using 6 No.of RCC well rings of 90cm inner dia (clear) with 5cm wall thickness made out of cement concrete 1:2:4 using 20mm hard broken jelly to a height of 30cm each supplying and fabricating 16 No. of 6mm dia MS rod vertically and 3 No. of 6mm dia MS rod circumferentially tied together with 18 guage binding wire for well rings including necessary earth work excavation 1m dia to a depth of 1m, supplying and filling 40mm HBG inside the erected well ring to a depth of 90cm, and top covered with RCC circular perforated cover slab of 1m dia and 5cm thick which inclusive of cost and fabrication of 6mm M.S reinforcement at 15 cm spacings on both directions and one 6mm M.S rod ties at the edge of the slab circumferentially including cost of moulding, curing, finishing and well placing in position and disposing off excavated earth with all initial leads and lifts in places as shown by the Departmental officers etc., complete in all respects.
Jayadhitya Groups (BID ID -1468738)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .