| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.5 LAccepted-AOC | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹34.6 L+₹13,592 (0.39%)Rejected-AOC | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | Kalamegam B L1 | EZHILMARAN V L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth | 25.74 | Cum | 263 ₹6,769.62 Lowest | 275 ₹7,078.5 |
| 2.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification | 130.93 | Cum | 2,068 ₹2,70,763.24 Lowest | 2,084 ₹2,72,858.12 |
| 3.00 | Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification | 130.93 | Cum | 5,768 ₹7,55,204.24 Lowest | 5,782 ₹7,57,037.26 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing | 274.5 | Cum | 547.5 ₹1,50,288.75 Lowest | 547.5 ₹1,50,288.75 Lowest |
| 5.00 | Plain Cement concrete 1:3:6 mix using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification | 10.76 | Cum | 6,518 ₹70,133.68 Lowest | 6,548 ₹70,456.48 |
| 6.00 | Plain Cement concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification | 118.88 | Cum | 7,064 ₹8,39,768.32 Lowest | 7,093 ₹8,43,215.84 |
| 7.00 | Provision for Bitumen pad | 17.97 | Cum | 234.3 ₹4,210.37 Lowest | 234.3 ₹4,210.37 Lowest |
| 8.00 | Provision for Culvert | 1 | No | 8,24,788 ₹8,24,788 Lowest | 8,28,300 ₹8,28,300 |
| 9.00 | Provision for Name board | 1 | No | 2,500 ₹2,500 Lowest | 2,500 ₹2,500 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 5,26,396.72 ₹5,26,396.72 Lowest | 5,28,470.16 ₹5,28,470.16 |
Tender Value
₹34.8 L
EMD Value
₹34,810
Closing Date
10 Mar 2026, 9:00 amClosed
The Block Development Officer(VP)
Panchayat union, Sendurai
Providing CC road with Culvert at Nallanayagapuram AD Colony Tamilmani house to Kandhan house in Vanchinapuram Panchayat
2026_RDTN_672459_1
RC.No.B5/1577/2025, Date.02.03.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Sendurai
As per tender document
5 documents required · 5 mandatory
₹0
₹34,810
14 Mar 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Plain Cement concrete 1:3:6 mix using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plain Cement concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Provision for Bitumen pad
Provision for Culvert
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.09 MB
TechnicalBid4.pdf
Tender Documents • 0.39 MB
BOQ_808159.xls
BOQ • 0.24 MB
Pbid4.pdf
Tender Documents • 4.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .