| 1 | L1₹1.4 CrAccepted-AOC | L1 | Accepted-AOC L1 offerer | |
| 2 | L2₹1.4 Cr+₹3.1 L (2.19%)Rejected-Finance NO 16 THIRUVALLUVAR SALAI CHINNATHIRUPATHI SALEM 638 008 | SALEM | SALEM | TAMIL NADU | 638008 | L2 | Rejected-Finance L2 offerer | |
| 3 | L3₹1.5 Cr+₹9.6 L (6.88%)Rejected-Finance 30 1 BHAVANI MAIN ROAD VEERAPANCHATRAM ERODE 638004 | ERODE | TAMIL NADU | 638004 | L3 | Rejected-Finance L3 offerer | |
| 4 | L4₹1.5 Cr+₹14.0 L (9.98%)Rejected-Finance NO 5 25A NADUMEDU PILLUR PO PARAMATHI VELLORE NAMAKKAL DIST 637 206 | NAMAKKAL | TAMIL NADU | 637206 | L4 | Rejected-Finance L4 offerer |
| Sl No | Description | Qty | Unit | CONTINENTAL CONSTRUCTION COMPANY L1 | THANGAM CONSTRUCTION L3 | sivaparameswari engineering construction and co L4 | SAI SAKTHI AND CO L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work narrow excavation for foundation in all soils and sub soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water where ever necessary, refilling the sides of foundations with excabvated earth in layers of not more than 15cm thk watered, well rammed , consolidated and depositing the surplus earth on bank with initial lead of 10m and initial lift of 2m, clearing and leveling the site etc., complete as directed by the federation officers and as per standard specifications. | 62.5 | cum | 360 ₹22,500 Lowest | 375 ₹23,437.5 | 400 ₹25,000 | 360 ₹22,500 Lowest |
| 2.00 | Supplying and filling with M-Sand in layers of not more than 15cm thick, well rammed, watered and consolidated etc., complete complying with standard specifications and as directed by the departmental officers. | 65 | Cum | 1,850 ₹1,20,250 Lowest | 2,000 ₹1,30,000 | 2,000 ₹1,30,000 | 1,850 ₹1,20,250 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (One Cement, Four M-sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering for flooring and foundation and including side shuttering, compaction, curing etc., complete as directed by the departmental officers. | 65 | cum | 5,500 ₹3,57,500 Lowest | 5,600 ₹3,64,000 | 5,600 ₹3,64,000 | 5,500 ₹3,57,500 Lowest |
| 4.00 | Supplying and filling with gravel for foundation and basement in layers of not more than 15 cm thick well rammed, watered and consolidated etc to required thickness, etc., completed as directed by the departmental officers. | 165 | cum | 450 ₹74,250 Lowest | 550 ₹90,750 | 550 ₹90,750 | 475 ₹78,375 |
| 5.00 | Supplying , erection and steel centering for all RCC works using M.S Sheet, M.S. angles casurina props C.W.joints for all type of RCC works (ie) beams, roof slab, lintel, column footing, column & roof beam etc., including necessary supports with all cross bracing, filling the slits and holes the reprieved materials should be taken by the contractor and side shuttering etc., complete as directed by the departmental officers - Plain surface- Up to basement | 292 | Sqm | 750 ₹2,19,000 Lowest | 850 ₹2,48,200 | 900 ₹2,62,800 | 750 ₹2,19,000 Lowest |
| 6.00 | 0.0 to 3.30 m ht- Column surface | 72.72 | Sqm | 800 ₹58,176 Lowest | 900 ₹65,448 | 1,000 ₹72,720 | 800 ₹58,176 Lowest |
| 7.00 | 3.30 to 4.30 m ht - Column surface | 27 | Sqm | 850 ₹22,950 Lowest | 950 ₹25,650 | 1,100 ₹29,700 | 850 ₹22,950 Lowest |
| 8.00 | 4.30 to 5.30 m ht - Column surface | 5.4 | Sqm | 900 ₹4,860 Lowest | 1,000 ₹5,400 | 1,200 ₹6,480 | 900 ₹4,860 Lowest |
| 9.00 | 0.00 to 3.30 m ht - Plain surface | 93 | Sqm | 800 ₹74,400 Lowest | 1,100 ₹1,02,300 | 1,000 ₹93,000 | 800 ₹74,400 Lowest |
| 10.00 | 3.30 to 4.30 m ht - Plain surface | 63 | Sqm | 850 ₹53,550 Lowest | 1,200 ₹75,600 | 1,100 ₹69,300 | 850 ₹53,550 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
17 Mar 2026, 3:00 pmClosed
DGM Civil
TCMPF Ltd, Aavin illam ,Nandanam
Construction of boiler shed with Mezzanine floor and allied structures at 60 MTPD Powder Plant Padalur Dairy
2026_TCMPF_669267_1
13891/Engg.3/2025
Open Tender
Civil Works
Lump-sum
180 days
Padalur
Refer tender document
8 documents required · 8 mandatory
₹0
₹1.4 L
Yes
MD, TCMPF Ltd, Aavin,Nandanam
8 Sept 2026
2 Mar 2026
18 Mar 2026
2 Mar 2026
17 Mar 2026
12 Mar 2026
3 Mar 2026 - 17 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work narrow excavation for foundation in all soils and sub soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water where ever necessary, refilling the sides of foundations with excabvated earth in layers of not more than 15cm thk watered, well rammed , consolidated and depositing the surplus earth on bank with initial lead of 10m and initial lift of 2m, clearing and leveling the site etc., complete as directed by the federation officers and as per standard specifications. | 62.5 | cum | - | - |
| 2 | Supplying and filling with M-Sand in layers of not more than 15cm thick, well rammed, watered and consolidated etc., complete complying with standard specifications and as directed by the departmental officers. | 65 | Cum | - | - |
| 3 | Plain Cement Concrete 1:4:8 (One Cement, Four M-sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering for flooring and foundation and including side shuttering, compaction, curing etc., complete as directed by the departmental officers. | 65 | cum | - | - |
| 4 | Supplying and filling with gravel for foundation and basement in layers of not more than 15 cm thick well rammed, watered and consolidated etc to required thickness, etc., completed as directed by the departmental officers. | 165 | cum | - | - |
| 5 | Supplying , erection and steel centering for all RCC works using M.S Sheet, M.S. angles casurina props C.W.joints for all type of RCC works (ie) beams, roof slab, lintel, column footing, column & roof beam etc., including necessary supports with all cross bracing, filling the slits and holes the reprieved materials should be taken by the contractor and side shuttering etc., complete as directed by the departmental officers - Plain surface- Up to basement | 292 | Sqm | - | - |
| 6 | 0.0 to 3.30 m ht- Column surface | 72.72 | Sqm | - | - |
| 7 | 3.30 to 4.30 m ht - Column surface | 27 | Sqm | - | - |
| 8 | 4.30 to 5.30 m ht - Column surface | 5.4 | Sqm | - | - |
| 9 | 0.00 to 3.30 m ht - Plain surface | 93 | Sqm | - | - |
| 10 | 3.30 to 4.30 m ht - Plain surface | 63 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
TDPadaluradditionalworks.pdf
Tender Documents • 0.60 MB
BOQ_804191.xls
BOQ • 0.48 MB
Padalurdatecorrigendum0704.pdf
PDF • 0.04 MB
corrigendumdate1.pdf
PDF • 0.05 MB
corrigendumdatepadalur.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .