Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹12.8 LAccepted-AOC | ₹12.8 L | L2 | Accepted-AOC LOWEST RATE |
| 2 | L1₹9.7 LRejected-Finance 113 2 2 ROAD NO 9 ADITYAPUR DISTRICT SARAIKELA KHARSAWAN 831013 | SARAIKELA KHARSAWAN | JHARKHAND | 831013 | ₹9.7 L | L1 | Rejected-Finance REJECTED |
| 3 | Rejected-Technical UHDH JHARKHAND | SARAIKELA KHARSAWAN | JHARKHAND | 831002 | - | - | Rejected-Technical HIGH RATE |
| 4 | Rejected-Technical | - | - | Rejected-Technical HIGH RATE |
| 5 | Rejected-Technical | - | - | Rejected-Technical HIGH RATE |
Tender Value
₹13.4 L
EMD Value
₹26,900
Closing Date
14 Mar 2026, 5:00 pmClosed
E.E. R.D.Spl. Division, Sahibganj
E.E. R.D.Spl. Division, vikas bhawan, Sahibganj
Construction of Shidhi ghat in vill-Nageshwarbag Pokhar of Badlu Murmu. under Rajmahal block, Dist- Sahibganj
2026_RDSPL_110852_1
RDSpl/SAHIBGANJ/18/2025-26 GR05
Open Tender
Civil Works
120 days
Rajmahal, Distt.-Sahibganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹26,900
11 May 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
14 Mar 2026
6 Mar 2026
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. BCD 5.1.1
Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) BCD 5.1.10
Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. BCD 5.6.1
Providing and laying with good quality of boulder duly packedas per specification and direcition of E/I. WRD. Part-B 5.6.4 Part A 6.4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) BCD 5.3.1.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) BCD 5.3.1.1
Providing designation 75B brick work in C.M (1:6 ) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I. B.C.D 5.2.6
Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. B.C.D 5.2.14
Providiag rough dressed random rubble stone masonary in CM (1:4) in foudation with approved quality of coarse sasd of requisite f.m (2.5 to 3) washed and screened with risking out joints to 12mm depth, curing scafolding and its removal wherever required royalty and all taxes etc. complete job as per specificition and direction of E/l.B.C.D 5.2.28
Providing 12mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. BCD 5.7.2
Carriage of materials Cement
Chips
Bricks
Stone Metal Gr-III
Stone Boulder
Good and Services Taxes @ 18%
Labour Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.45 MB
BOQ_149825.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid